One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion in Environment Clearance of "Centre for Perfect Health"
Project details
| Official title | Proposed Expansion in Environment Clearance of "Centre for Perfect Health" at Village Wahangaon, Taluka Mawal, District Pune, Maharashtra by Maharishi Vedoddharak Foundation and Maharishi Vedic Health Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 Nov 2023 |
| Application filed | 28 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Maharishi Vedic Health Private Limited |
| Land area | 800 m² |
| Project cost | ₹1 lakh |
| Village / locality | Borivali |
| Taluk / tehsil | Mawal |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01827 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 May 2024 | Environmental approval granted | 0.2 acres | ₹1 lakh |
| Early planning filed 28 Nov 2023 (this page) | Cleared for impact study | 0.2 acres | ₹1 lakh |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 100% of them.
Where it is
Borivali, Mawal, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion in Environment Clearance of "Centre for Perfect Health" — environmental approval granted, 0 m away
- Shirawta Off Stream Open Loop Pumped Storage Project (1800 MW) — environmental approval granted, 7.3 km away
- Shirawta Off Stream Open Loop Pumped Storage Project (1800 MW) — in-principle approval, conditions pending, 7.3 km away
- Shirawta Off Stream Open Loop Pumped Storage Project (1800 MW) — cleared for impact study, 7.3 km away
- Diversion of Forest Land for laying underground pipeline for agriculture… — lapsed, 7.6 km away
- Bhivpuri Off-Stream Open Loop Pumped Storage Project (1000 MW) — environmental approval granted, 9 km away
- Bhivpuri Off-Stream Open Loop Pumped Storage Project (1000 MW) — forest land use approved, 9 km away
- Bhivpuri Off-Stream Open Loop Pumped Storage Project (1000 MW) — cleared for impact study, 9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.