Quick answers
What is this project?
Proposed Expansion of Existing Distillery/Ethanol plant from 30 KLPD to 105 KLPD for Fuel Ethanol by M/S. Shri. Vridheshwar Sahakari Sakhar Karkhana Limited is an approved industrial project in Kasar Pimpalgaon, Pathardi, Ahmadnagar, Maharashtra. The site covers 21 acres.
Who is building it?
The applicant is Shri Vridheshwar Sahakari Sakhar Karkhana LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Dec 2023), as of 27 Nov 2026.
Where is it?
In Kasar Pimpalgaon, Pathardi, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹145.1 crore and a site of 21 acres.
When was it filed?
The application was filed on 1 Sept 2023.
Project details
| Official title | Proposed Expansion of Existing Distillery/Ethanol plant from 30 KLPD to 105 KLPD for Fuel Ethanol at village Kasar Pimpalgaon, Adinathnagar, Tal. Pathardi, District Ahmednagar, Maharashtra by M/S. Shri. Vridheshwar Sahakari Sakhar Karkhana Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Dec 2023 |
| Application filed | 1 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shri Vridheshwar Sahakari Sakhar Karkhana LTD. |
| Land area | 21 acres (8.5 ha) |
| Project cost | ₹145.1 crore |
| Village / locality | Kasar Pimpalgaon |
| Taluk / tehsil | Pathardi |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-01872 |
In context
62 applications in Ahmadnagar since January 2022 are in the same category (Industry): 36 approved, 14 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21 acres, this one is smaller than 73% of them.
Where it is
Kasar Pimpalgaon, Pathardi, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Bsnl 4g Saturation Govt of Indias Project From Ahmednagar-Tisgaon 0.47ha… — lapsed, 18.5 km away
- Kharadgaon Sand Ghat, Godavari River ,Nearest Gut no 480 to 485, 488 to 490,… — environmental approval granted, 18.9 km away
- Environment Clearance for Proposed Hakewadi Stone Quarry Located at Gat no.30… — environmental approval granted, 19.1 km away
- Environmental Clearance for the Basalt Stone Quarry of Shri. Dipak Gangadhar… — lapsed, 24.2 km away
- Expansion of Sugar Factory from 5,500 TCD to 9,000 TCD & Cogeneration Plant… — cleared for impact study, 26.8 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — under forest review, 27.4 km away
- CIPM at M/s. Galaxy Laboratories Pvt. Ltd., — initial checks, 27.5 km away
- Application for Consent to Operate of synthetic organic chemical plant located… — initial checks, 27.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.