Quick answers
What is "Slum Rehabilitation Scheme"?
"Slum Rehabilitation Scheme" is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 13.6 acres.
Who is building it?
The applicant is Ms Sterling Buildcon P L.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Jun 2023), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹2,340.7 crore and a site of 13.6 acres.
When was it filed?
The application was filed on 14 Jun 2023.
Project details
| Official title | "Slum Rehabilitation Scheme" at Village Borla-Chembur, and Village Ghatkoper-Kirol, Mumbai. |
|---|---|
| Status | Cleared for impact study |
| Status since | 14 Jun 2023 |
| Application filed | 14 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Ms Sterling Buildcon P L |
| Land area | 13.6 acres (5.5 ha) |
| Project cost | ₹2,340.7 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03119 |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.6 acres, this one is larger than 89% of them.
237 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.7 km away).
Other projects nearby
- "Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT),… — withdrawn, 200 m away
- "Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT),… — lapsed, 200 m away
- Proposed Residential building at CTS No. 52/B, 52/C of village – Borla, St.… — environmental approval granted, 350 m away
- Proposed Residential building at CTS No. 52/B, 52/C of villoge - Borla, St.… — withdrawn, 350 m away
- Proposed Residential building at CTS No. 52/B, 52/C of village – Borla, St.… — withdrawn, 350 m away
- Proposed Residential building at CTS No. 52/B, 52/C of village – Borla, St.… — environmental approval granted, 350 m away
- Proposed Residential building at CTS No. 52/A, 52/C & 55 (P) of village –… — environmental approval granted, 350 m away
- Proposed Residential building at CTS No. 52/A, 52/C & 55 (Pt) of village -… — withdrawn, 350 m away
More from Ms Sterling Buildcon P L in Mumbai Suburban
- "Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT),… — withdrawn
- "Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT),… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.