Quick answers
What is this project?
"Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT), 76(PT), 77(PT), 78, 79, 80, 81, 82, (PT), 85(PT), 286(PT), 287(PT), 472 (PT), 473(PT), 476(PT), 477(PT), 478(PT), 479(PT) by M/s. Sterling Buildcon Pvt. Ltd is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 4.4 acres.
Who is building it?
The applicant is Ms Sterling Buildcon P L.
Has it been approved?
No. The application was withdrawn on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹545 crore and a site of 4.4 acres.
When was it filed?
The application was filed on 14 Apr 2025.
Project details
| Official title | "Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT), 76(PT), 77(PT), 78, 79, 80, 81, 82, (PT), 85(PT), 286(PT), 287(PT), 472 (PT), 473(PT), 476(PT), 477(PT), 478(PT), 479(PT) at Village Borla-Chembur, and Village Ghatkoper-Kirol, Mumbai by M/s. Sterling Buildcon Pvt. Ltd. |
|---|---|
| Status | Withdrawn |
| Status since | 13 Aug 2025 |
| Application filed | 14 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ms Sterling Buildcon P L |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹545 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10879 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Apr 2025 (this page) | Withdrawn | 4.4 acres | ₹545 crore |
| New project filed 16 Jan 2025 | Lapsed | 4.4 acres | ₹545 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.4 acres, this one is larger than 71% of them.
237 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.9 km away).
Other projects nearby
- "Slum Rehabilitation Scheme" for sector 3 at plot bearing CTS nos. 75(PT),… — lapsed, 0 m away
- "Slum Rehabilitation Scheme" — cleared for impact study, 200 m away
- Proposed Residential building at CTS No. 52/A, 52/C & 55 (P) of village –… — environmental approval granted, 200 m away
- Proposed Residential building at CTS No. 52/A, 52/C & 55 (Pt) of village -… — withdrawn, 200 m away
- Proposed Residential building at CTS No. 52/A, 52/C & 55 (Pt) of village –… — withdrawn, 200 m away
- Proposed Residential building at CTS No. 52/A, 52/C & 55 (P) of village –… — environmental approval granted, 200 m away
- Proposed Residential building at CTS No. 52/B, 52/C of village – Borla, St.… — environmental approval granted, 250 m away
- Proposed Residential building at CTS No. 52/B, 52/C of villoge - Borla, St.… — withdrawn, 250 m away
More from Ms Sterling Buildcon P L in Mumbai Suburban
- "Slum Rehabilitation Scheme" — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.