Quick answers
What is Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd.?
This approved industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. is in Babhalde, Sindkhede, Dhule, Maharashtra. The site covers 18.5 acres.
Who is building it?
The applicant is Neeranarmada Phosphates Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Sept 2024), as of 27 Nov 2026.
Where is it?
In Babhalde, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹60.1 crore and a site of 18.5 acres.
When was it filed?
The application was filed on 22 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Sept 2024 |
| Application filed | 22 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Neeranarmada Phosphates Private Limited |
| Land area | 18.5 acres (7.5 ha) |
| Project cost | ₹60.1 crore |
| Village / locality | Babhalde |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03661 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Jul 2024 (this page) | Environmental approval granted | 18.5 acres | ₹60.1 crore |
| New project filed 7 Mar 2024 | Returned to applicant | 18.5 acres | ₹60.1 crore |
| Early planning filed 31 Dec 2023 | Cleared for impact study | 18.5 acres | ₹60.1 crore |
In context
31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 18.5 acres, this one is smaller than 71% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babhalde, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — returned to applicant, 0 m away
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — cleared for impact study, 0 m away
- Proposed Chemical Fertilizers Manufacturing Unit with Production Capacity of… — cleared for impact study, 300 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — under environmental review, 400 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — returned to applicant, 400 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — returned to applicant, 400 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — cleared for impact study, 400 m away
- Proposed Phosphatic Fertilizer and Allied products manufacturing Industry by… — cleared for impact study, 400 m away
All 3 Neeranarmada Phosphates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.