Quick answers
What is this project?
Proposed Chemical Fertilizers Manufacturing Unit with Production Capacity of 3530 TPD and a Clinker Grinding Unit of Capacity 1500 TPD at Plot no.- T-29, Nardhana Industrial Area - Phase-II, Village- Babhale, Taluka- Shindkheda, District- Dhule, Maharashtra by M/s Patel Agrichem India Private Limited is a proposed industrial project in Babhalde, Sindkhede, Dhule, Maharashtra. The site covers 19.8 acres.
Who is building it?
The applicant is Patel Agrichem India Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Nov 2026), as of 27 Nov 2026.
Where is it?
In Babhalde, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹750 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Patel Agrichem India Private Limited |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹750 crore |
| Village / locality | Babhalde |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12870 |
In context
31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.8 acres, this one is smaller than 61% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babhalde, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — environmental approval granted, 300 m away
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — returned to applicant, 300 m away
- Industrial project by M/s. NeeraNarmada Phosphates Pvt. Ltd. — cleared for impact study, 300 m away
- Proposed Phosphatic Fertilizer and Allied products manufacturing Industry by… — cleared for impact study, 450 m away
- Proposed Phosphatic Fertilizer and Allied products manufacturing Industry by… — environmental approval granted, 450 m away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — environmental approval granted, 500 m away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — cleared for impact study, 500 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — under environmental review, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.