What is Developing? Open the mapMap

WithdrawnBuildings & townships · Kolhapur, Maharashtra

'Proposed Expansion of Industrial Shed Construction' by M/s. Kirloskar Oil Engines Limited at Plot No. D-1, Five Star MIDC Kagal-Hatkanangale, A/p.-Talandage Tal. Hatkanangale, Dist. Kolhapur.

'Proposed Expansion of Industrial Shed Construction' by M/s. Kirloskar Oil Engines Limited at Plot No. D-1, Five Star MIDC Kagal-Hatkanangale, A/p.-Talandage Tal. Hatkanangale, Dist. Kolhapur is a withdrawn industrial building project in Talandage, Hatkanangle, Kolhapur, Maharashtra. The site covers 160.8 acres. Its stated project cost is ₹1,020.3 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 4 Feb 2025).

See it on the live map All projects in Kolhapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

'Proposed Expansion of Industrial Shed Construction' by M/s. Kirloskar Oil Engines Limited at Plot No. D-1, Five Star MIDC Kagal-Hatkanangale, A/p.-Talandage Tal. Hatkanangale, Dist. Kolhapur is a withdrawn industrial building project in Talandage, Hatkanangle, Kolhapur, Maharashtra. The site covers 160.8 acres.

Who is building it?

The applicant is Kirloskar Oil Engines Limited.

Has it been approved?

No. The application was withdrawn on 4 Feb 2025, so it is no longer under consideration.

Where is it?

In Talandage, Hatkanangle, Kolhapur, Maharashtra.

How big is it?

It has a stated cost of ₹1,020.3 crore and a site of 160.8 acres.

When was it filed?

The application was filed on 3 Dec 2024.

Project details

StatusWithdrawn
Status since4 Feb 2025
Application filed3 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantKirloskar Oil Engines Limited
UseIndustrial
Land area160.8 acres (65.1 ha)
Project cost₹1,020.3 crore
Village / localityTalandage
Taluk / tehsilHatkanangle
DistrictKolhapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-03895

In context

33 applications in Kolhapur since January 2022 are in the same category (Buildings & townships): 23 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 160.8 acres, this one is larger than 85% of them.

20 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Talandage, Hatkanangle, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kirloskar Oil Engines Limited in Kolhapur

All 4 Kirloskar Oil Engines projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.