What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Kolhapur, Maharashtra

Proposed Expansion of Industrial Shed Construction by Kirloskar Oil Engines Limited at Plot No. D-1, Five Star MIDC Kagal-Hatkanangale, A/p.-Talandage Tal. Hatkanangale, Dist. Kolhapur.

Proposed Expansion of Industrial Shed Construction by Kirloskar Oil Engines Limited at Plot No. D-1, Five Star MIDC Kagal-Hatkanangale, A/p.-Talandage Tal. Hatkanangale, Dist. Kolhapur is an approved industrial building project in Sangaon Kasaba, Kagal, Kolhapur, Maharashtra. The site covers 160.8 acres. Its stated project cost is ₹1,020.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Nov 2025).

See it on the live map All projects in Kolhapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Industrial Shed Construction by Kirloskar Oil Engines Limited at Plot No. D-1, Five Star MIDC Kagal-Hatkanangale, A/p.-Talandage Tal. Hatkanangale, Dist. Kolhapur is an approved industrial building project in Sangaon Kasaba, Kagal, Kolhapur, Maharashtra. The site covers 160.8 acres.

Who is building it?

The applicant is Kirloskar Oil Engines Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 Nov 2025), as of 27 Nov 2026.

Where is it?

In Sangaon Kasaba, Kagal, Kolhapur, Maharashtra.

How big is it?

It has a stated cost of ₹1,020.3 crore and a site of 160.8 acres.

When was it filed?

The application was filed on 8 May 2025.

Project details

StatusEnvironmental approval granted
Status since4 Nov 2025
Application filed8 May 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantKirloskar Oil Engines Limited
UseIndustrial
Land area160.8 acres (65.1 ha)
Plot area6,50,900 m² (70,06,223 sq ft)
Project cost₹1,020.3 crore
Village / localitySangaon Kasaba
Taluk / tehsilKagal
DistrictKolhapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09494

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 25 Jul 2026Cleared for impact study160.8 acres₹1,900 crore
Expansion filed 8 May 2025 (this page)Environmental approval granted160.8 acres₹1,020.3 crore
Early planning filed 5 Feb 2025Cleared for impact study160.8 acres₹1,020.3 crore

In context

33 applications in Kolhapur since January 2022 are in the same category (Buildings & townships): 23 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 160.8 acres, this one is larger than 85% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sangaon Kasaba, Kagal, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kirloskar Oil Engines Limited in Kolhapur

All 4 Kirloskar Oil Engines projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.