One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential cum commercial Building on S. NO. 63/1/1 of Village-Pale, Taluka…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 14 Feb 2025 |
| Application filed | 3 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jetblue Associates |
| Use | Other |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹117.9 crore |
| Village / locality | Pale |
| Taluk / tehsil | Ulhasnagar |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04160 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Oct 2024 | Lapsed | 2.5 acres | ₹117.9 crore |
| New project filed 3 Sept 2024 (this page) | Withdrawn | 2.5 acres | ₹117.9 crore |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 65% of them.
87 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pale, Ulhasnagar, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential cum commercial Building on S. NO. 63/1/1 of Village-Pale,… — lapsed, 0 m away
- Proposed Building & Construction Project at Survey No. 64/1/B Plot No. 2,… — under environmental review, 250 m away
- Proposed Residential cum commercial Project on Plot A, Bearing Survey no.… — environmental approval granted, 700 m away
- Proposed Greenfield Project for manufacturing of Specialty chemicals by… — environmental approval granted, 950 m away
- Proposed Greenfield Project for manufacturing of Specialty chemicals by… — cleared for impact study, 950 m away
- Proposed Building & Construction Project at S. No. 40/4/2, 44/3/A, 44/1, 44/2,… — environmental approval granted, 1.1 km away
- Building project by M/s. Patel RPL Landscape and Infinity Realtors — lapsed, 1.1 km away
- Proposed new project for manufacturing of synthetic organic chemicals at Plot… — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.