Proposed Expansion of Existing Oxalic Acid Manufacturing Facility from 10200 MT/Year to 13800 MT/Year by M/s Radiant Indus Chem Pvt. Ltd. at Plot No. F-15, MIDC Industrial Area Chikalthana, Dist. And TQ – Aurangabad, Maharashtra – 431 006

Proposed Expansion of Existing Oxalic Acid Manufacturing Facility from 10200 MT/Year to 13800 MT/Year by M/s Radiant Indus Chem Pvt. Ltd. at Plot No. F-15, MIDC Industrial Area Chikalthana, Dist. And TQ – Aurangabad, Maharashtra – 431 006 is a proposed industrial project in Chikalthana, Aurangabad, Maharashtra. The site covers 3.8 acres. Its stated project cost is ₹16.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Jan 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Oxalic Acid Manufacturing Facility from 10200 MT/Year to…

Project details

StatusCleared for impact study
Status since30 Jan 2025
Application filed3 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRadiant Indus Chem Private Limited
Land area3.8 acres (1.5 ha)
Project cost₹16.9 crore
Village / localityChikalthana
Taluk / tehsilAurangabad
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-04251

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 29 Mar 2025Environmental approval granted3.8 acres₹16.9 crore
Early planning filed 3 Oct 2024 (this page)Cleared for impact study3.8 acres₹16.9 crore

In context

50 applications in Aurangabad since January 2022 are in the same category (Industry): 34 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.8 acres, this one is smaller than 72% of them.

27 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chikalthana, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.