Quick answers
What is Expansion in EC for Slum Rehabilitation Scheme?
Expansion in EC for Slum Rehabilitation Scheme is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 10.1 acres.
Who is building it?
The applicant is Amity Constructions.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Jan 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹970.6 crore and a site of 10.1 acres.
When was it filed?
The application was filed on 23 May 2024.
Project details
| Official title | Expansion in EC for Slum Rehabilitation Scheme at Village Kurar, Malad (E), Pahadi, Goregaon, Mumbai. |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Jan 2026 |
| Application filed | 23 May 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Amity Constructions |
| Use | Residential |
| Land area | 10.1 acres (4.1 ha) |
| Built-up area | 3,71,660 m² (40,00,511 sq ft) |
| Plot area | 11,500 m² (1,23,785 sq ft) |
| Project cost | ₹970.6 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04263 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 23 May 2024 (this page) | Environmental approval granted | 10.1 acres | ₹970.6 crore |
| Early planning filed 18 May 2024 | Cleared for impact study | 10.1 acres | ₹970.6 crore |
| Expansion filed 23 Apr 2024 | Withdrawn | 10.1 acres | ₹970.6 crore |
| Early planning filed 5 Apr 2024 | Cleared for impact study | 10.1 acres | ₹970.6 crore |
| Early planning filed 12 Jul 2023 | Cleared for impact study | 10.1 acres | ₹970.6 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.1 acres, this one is larger than 86% of them.
572 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.5 km away).
Other projects nearby
- Slum Rehabilitation Scheme by M/s. Amity Constructions — withdrawn, 0 m away
- Expansion in EC for Slum Rehabilitation Scheme — cleared for impact study, 0 m away
- Expansion in EC for Slum Rehabilitation Scheme — withdrawn, 0 m away
- Expansion in EC for Slum Rehabilitation Scheme — cleared for impact study, 0 m away
- Expansion in EC for Slum Rehabilitation Scheme — cleared for impact study, 0 m away
- Proposed Residential cum commercial Redevelopment project known as "Sigma… — environmental approval granted, 150 m away
- Proposed Expansion of Slum Rehabilitation Scheme by M/s. Mauli Sai Developers… — cleared for impact study, 250 m away
- Proposed Expansion of Slum Rehabilitation Scheme by M/s. Mauli Sai Developers… — environmental approval granted, 250 m away
More from Amity Constructions in Mumbai Suburban
All 6 Amity Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.