What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Mumbai Suburban, Maharashtra

Expansion in EC for Slum Rehabilitation Scheme

Expansion in EC for Slum Rehabilitation Scheme is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 10.1 acres. Its stated project cost is ₹970.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 May 2024).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Expansion in EC for Slum Rehabilitation Scheme?

Expansion in EC for Slum Rehabilitation Scheme is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 10.1 acres.

Who is building it?

The applicant is Amity Constructions.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 May 2024), as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹970.6 crore and a site of 10.1 acres.

When was it filed?

The application was filed on 18 May 2024.

One of 5 filings for this project. The project's main page, with every filing and where each stands: Expansion in EC for Slum Rehabilitation Scheme

Project details

Official titleExpansion in EC for Slum Rehabilitation Scheme at Village Kurar, Malad (E), Pahadi, Goregaon, Mumbai.
StatusCleared for impact study
Status since21 May 2024
Application filed18 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantAmity Constructions
UseResidential
Land area10.1 acres (4.1 ha)
Built-up area3,71,660 m² (40,00,511 sq ft)
Project cost₹970.6 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-05462

All filings for this project

This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 23 May 2024Environmental approval granted10.1 acres₹970.6 crore
Early planning filed 18 May 2024 (this page)Cleared for impact study10.1 acres₹970.6 crore
Expansion filed 23 Apr 2024Withdrawn10.1 acres₹970.6 crore
Early planning filed 5 Apr 2024Cleared for impact study10.1 acres₹970.6 crore
Early planning filed 12 Jul 2023Cleared for impact study10.1 acres₹970.6 crore

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.1 acres, this one is larger than 86% of them.

572 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.5 km away).

Other projects nearby

More from Amity Constructions in Mumbai Suburban

All 6 Amity Constructions projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.