Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Jan 2026 |
| Application filed | 27 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ramkrishna Cine Exhibitors |
| Use | Mixed use |
| Land area | 6.6 acres (2.7 ha) |
| Built-up area | 1,62,963 m² (17,54,117 sq ft) |
| Plot area | 26,602 m² (2,86,341 sq ft) |
| Project cost | ₹308 crore |
| Village / locality | Mahammadwadi |
| Taluk / tehsil | Pune City |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04939 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Dec 2024 (this page) | Environmental approval granted | 6.6 acres | ₹308 crore |
| Early planning filed 26 Sept 2024 | Cleared for impact study | 6.6 acres | ₹308 crore |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 6.6 acres, this one is larger than 63% of them.
287 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahammadwadi, Pune City, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Pune Ring Road Eastern Alignment (Part 2): 68.8 km Expressway Expansion in Pune, Maharashtra (13.6 km away).
Other projects nearby
- Proposed Expansion in Residential and Commercial Project "Elina" at PLOT C + E… — cleared for impact study, 0 m away
- RBD Shanti Renaissance by M/s RBD Infrastructures Pvt. Ltd. — environmental approval granted, 150 m away
- Transfer of Environmental Clearance for RBD Shanti Renaissance from M/s RBD… — under environmental review, 150 m away
- Diversion of Forest Land for Construction, Development & Reduction in Slope of… — more information requested, 200 m away
- Proposed Residential and Commercial project located at S.no. 38/1,38/2a,38/4/2… — lapsed, 200 m away
- Proposed Residential and Commercial project located at S.no. 38/1,38/2a,38/4/2… — more information requested, 200 m away
- Residential and Commercial Development by Acropolis Purple Developers — environmental approval granted, 200 m away
- Residential and Commercial Development by Acropolis Purple Developers — cleared for impact study, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.