What is Developing? Open the mapMap

Environmental approval grantedIndustry · Bhandara, Maharashtra

60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW Electricity Generation by Tajshree Biofuel Pvt. Ltd., Village: Bothali Rithi, Tal: Mohadi, Dist.: Bhandara, Maharashtra State

60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW Electricity Generation by Tajshree Biofuel Pvt. Ltd., Village: Bothali Rithi, Tal: Mohadi, Dist.: Bhandara, Maharashtra State is an approved industrial project in Bothali, Mohadi, Bhandara, Maharashtra. The site covers 14.9 acres. Its stated project cost is ₹70 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Aug 2024).

See it on the live map All projects in Bhandara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleEstablishment of 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW Electricity Generation by Tajshree Biofuel Pvt. Ltd., Village: Bothali Rithi, Tal: Mohadi, Dist.: Bhandara, Maharashtra State
StatusEnvironmental approval granted
Status since19 Aug 2024
Application filed21 May 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantTajshree Biofuel Private Limited
Land area14.9 acres (6 ha)
Project cost₹70 crore
Village / localityBothali
Taluk / tehsilMohadi
DistrictBhandara
StateMaharashtra
Location fromSite area on record
Our referenceWID-MH-05052

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 May 2024 (this page)Environmental approval granted14.9 acres₹70 crore
New project filed 7 Mar 2024Returned to applicant14.9 acres₹70 crore
New project filed 23 Feb 2024Returned to applicant14.9 acres₹70 crore

In context

11 applications in Bhandara since January 2022 are in the same category (Industry): 4 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 14.9 acres, this one is smaller than 64% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bothali, Mohadi, Bhandara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tajshree Biofuel Private Limited in Bhandara

4 Tajshree Biofuel projects in Bhandara
All 5 Tajshree Biofuel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.