One of 3 filings for this project. The project's main page, with every filing and where each stands: 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW Electricity…
Project details
| Official title | Establishment of 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW Electricity Generation by Tajshree Biofuel Pvt. Ltd., Village: Bothali Rithi, Tal: Mohadi, Dist.: Bhandara, Maharashtra State |
|---|---|
| Status | Returned to applicant |
| Status since | 9 May 2024 |
| Application filed | 7 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tajshree Biofuel Private Limited |
| Land area | 14.9 acres (6 ha) |
| Project cost | ₹70 crore |
| Village / locality | Bothali |
| Taluk / tehsil | Mohadi |
| District | Bhandara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06060 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 May 2024 | Environmental approval granted | 14.9 acres | ₹70 crore |
| New project filed 7 Mar 2024 (this page) | Returned to applicant | 14.9 acres | ₹70 crore |
| New project filed 23 Feb 2024 | Returned to applicant | 14.9 acres | ₹70 crore |
In context
11 applications in Bhandara since January 2022 are in the same category (Industry): 4 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 14.9 acres, this one is smaller than 64% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bothali, Mohadi, Bhandara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW… — returned to applicant, 0 m away
- 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW… — environmental approval granted, 0 m away
- 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW… — returned to applicant, 0 m away
- Lanjera Futala Block — more information requested, 2.2 km away
- Quartz & Quartzite Project of Mr. Vinayak Vasantrao Kolte — environmental approval granted, 3.1 km away
- Re-diversion of 0.783 ha Forest land for construction of Feeder Canal on Ch.… — lapsed, 4.2 km away
- Proposed Manganese Ore Processing Plant by M/s. SHRISIYARAM METALLOIDS PVT. LTD. — cleared for impact study, 4.9 km away
- Mining project by HIVRA-NAVEGAON MANGANESE ORE BLOCK of P.M. GRANITE EXPORT… — cleared for impact study, 5.7 km away
More from Tajshree Biofuel Private Limited in Bhandara
- 60 KLPD Grain based Distillery for Ethanol Production alongwith 1.5 MW… — returned to applicant
4 Tajshree Biofuel projects in Bhandara
All 5 Tajshree Biofuel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.