Quick answers
What is this project?
Proposed SRA Project "Hari Om CHS Ltd" on plot bearing CTS no. 610A/1B/2 (pt.) under Reg. 33(10) of Village Malad (East) Pujari Compound, Gen. A.K. Vaidya Marg, Dindoshi, Malad (E) and proposed S. R. Scheme under Reg. 33(11) (Non-Slum) on plot bearing CTS no. 610A/1B/1 (pt.) of Village Malad (East) and Reg. 30 on CTS no. 610A/1B/2 (pt.) of village Malad East Mumbai. By M/ s. Raghvendra Construction Company Pvt is an approved mixed-use project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans 6 towers of up to 24 floors on 1.6 acres.
Who is building it?
The applicant is Raghvendra Construction Company Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Dec 2025), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹98.3 crore and a site of 1.6 acres.
When was it filed?
The application was filed on 6 Aug 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed SRA Project "Hari Om CHS Ltd" on plot bearing CTS no. 610A/1B/2 (pt.) under…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Dec 2025 |
| Application filed | 6 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Raghvendra Construction Company Private Limited |
| Use | Mixed use |
| Towers | 6 |
| Floors (tallest) | 24 |
| Height | 73 m |
| Land area | 1.6 acres (0.6 ha) |
| Built-up area | 33,748 m² (3,63,260 sq ft) |
| Project cost | ₹98.3 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06879 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Feb 2026 | Environmental approval granted | 1.6 acres | ₹98.3 crore |
| New project filed 6 Aug 2025 (this page) | Environmental approval granted | 1.6 acres | ₹98.3 crore |
| New project filed 24 Apr 2025 | Withdrawn | 1.6 acres | ₹97.7 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.6 acres, this one is smaller than 57% of them.
475 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (8.7 km away).
Other projects nearby
- Proposed SRA Project "Hari Om CHS Ltd" on plot bearing CTS no. 610A/1B/2 (pt.)… — environmental approval granted, 0 m away
- Proposed SRA Project "Hari Om CHS Ltd" on plot bearing CTS no. 610A/1B/2 (pt.)… — withdrawn, 0 m away
- Proposed Residential & Commercial project - Sahayog SRA CHS at CTS No.677A/1,… — environmental approval granted, 50 m away
- M/S D.G.S Township PVT. LTD. — environmental approval granted, 150 m away
- Environmental Clearance for Proposed S. R. Scheme U/Reg. 33(10) OF DCPR 2034… — environmental approval granted, 200 m away
- Environmental Clearance for Proposed S. R. Scheme U/Reg. 33(10) OF DCPR 2034… — withdrawn, 200 m away
- Environmental clearance for proposed expansion of construction project (SRA… — cleared for impact study, 300 m away
- Proposed expansion of construction project (SRA scheme) by M/s. Ravi Ashish… — lapsed, 300 m away
All 3 Raghvendra Construction Company projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.