Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Jul 2025 |
| Application filed | 9 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Adani Green Energy Limited |
| Land area | 1,411.1 acres (571.1 ha) |
| Project cost | ₹5,516.8 crore |
| Village / locality | Khanu |
| Taluk / tehsil | Velhe |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06961 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 9 Jun 2025 (this page) | Cleared for impact study | 1,411.1 acres | ₹5,516.8 crore |
| Early planning filed 20 Dec 2024 | Cleared for impact study | 1,411.1 acres | ₹5,516.8 crore |
In context
45 applications in Pune since January 2022 are in the same category (Water & irrigation): 21 approved, 15 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,411.1 acres, this one is larger than 50% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khanu, Velhe, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Warasgaon Warangi PSP — cleared for impact study, 0 m away
- Warasgaon Warangi Pumped Storage Project — lapsed, 0 m away
- Warasgaon Warangi Pumped Storage Project (1200 MW) — cleared for impact study, 500 m away
- Warasgaon Warangi Pumped Storage Project (1200 MW) — returned to applicant, 1.4 km away
- Diversion of 79.9793 ha forest land for Warasgaon-Warangi Pumped Storage… — not approved, 5.7 km away
- Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages:… — under forest review, 9.5 km away
- Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages:… — cleared for impact study, 9.5 km away
- Improvement of Panshet-Tav-Gadle-Dhamanhol-Tamhini Road (MDR-112) from Km.… — under wildlife review, 10.5 km away
More from Adani Green Energy Limited in Pune
- Warasgaon Warangi Pumped Storage Project — lapsed
- Warasgaon Warangi Pumped Storage Project (1200 MW) — returned to applicant
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study
- Warasgaon Warangi Pumped Storage Project (1200 MW) — cleared for impact study
7 Adani Green Energy projects in Pune
All 39 Adani Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.