Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 May 2024 |
| Application filed | 15 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Water & irrigation |
| Applicant | Adani Green Energy Limited |
| Land area | 940.6 acres (380.7 ha) |
| Project cost | ₹7,047.6 crore |
| Village / locality | Ghatghar |
| Taluk / tehsil | Junnar |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03640 |
In context
45 applications in Pune since January 2022 are in the same category (Water & irrigation): 21 approved, 15 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 940.6 acres, this one is smaller than 64% of them.
Where it is
Ghatghar, Junnar, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study, 2.7 km away
- Kalu Pumped Storage Project (1800 MW) — under environmental review, 19.6 km away
- The Rehabilitation and Up-Gradation of Existing Kalyan-Nirmal National Highway… — more information requested, 19.6 km away
- Malshej Ghat Closed Loop Off-Stream Pumped Storage Project — cleared for impact study, 21.3 km away
- Malshej Ghat Closed Loop Off-Stream Pumped Storage Project (1200 MW) — more information requested, 21.4 km away
- KONDHAWAL TO BALVIRWADI STATE HIGHWAY NO.112 ROAD FROM VILLAGE KONDHAWAL TO… — more information requested, 34.4 km away
- Diversion of Forest Land for improvement to ODR-216 (km. 4/000 to 10/500) from… — more information requested, 34.8 km away
- AHUPE – BALVIRWADI - KONDHWAL TO STATE HIGHWAY NO.112 ROAD FROM VILLAGE AHUPE… — lapsed, 34.9 km away
More from Adani Green Energy Limited in Pune
- Warasgaon Warangi PSP — cleared for impact study
- Warasgaon Warangi PSP — cleared for impact study
- Warasgaon Warangi Pumped Storage Project — lapsed
- Warasgaon Warangi Pumped Storage Project (1200 MW) — returned to applicant
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study
- Warasgaon Warangi Pumped Storage Project (1200 MW) — cleared for impact study
7 Adani Green Energy projects in Pune
All 39 Adani Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.