What is Developing? Open the mapMap

Cleared for impact studyIndustry · Gadchiroli, Maharashtra

Proposed pilot project for manufacturing of 1 KLD Portable Ethanol at Plot No. A-13/1, MIDC Industrial Area, Gadchiroli, State - Maharashtra 442605 by M/s. LTB Beverages

Proposed pilot project for manufacturing of 1 KLD Portable Ethanol at Plot No. A-13/1, MIDC Industrial Area, Gadchiroli, State - Maharashtra 442605 by M/s. LTB Beverages is a proposed industrial project in Gadchiroli, Maharashtra. The site covers 1 acre. Its stated project cost is ₹10 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Sept 2025).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed pilot project for manufacturing of 1 KLD Portable Ethanol at Plot No. A-13/1, MIDC Industrial Area, Gadchiroli, State - Maharashtra 442605 by M/s. LTB Beverages is a proposed industrial project in Gadchiroli, Maharashtra. The site covers 1 acre.

Who is building it?

The applicant is Loukik Tatyaji Bhiwapure.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 Sept 2025), as of 27 Nov 2026.

Where is it?

In Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹10 crore and a site of 1 acre.

When was it filed?

The application was filed on 6 May 2025.

Project details

StatusCleared for impact study
Status since24 Sept 2025
Application filed6 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantLoukik Tatyaji Bhiwapure
Land area1 acres (0.4 ha)
Project cost₹10 crore
Village / localityGadchiroli
Taluk / tehsilGadchiroli
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-07298

In context

30 applications in Gadchiroli since January 2022 are in the same category (Industry): 15 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 97% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.