Quick answers
What is this project?
Diversion of 0.1825 Ha. (Which falls within tiger corridor) Forest Land for laying Underground Optical Cable from Devapur Rith to Navegaon along the Roads in existing RoW of SH-378 is a proposed road project in Devapur Rith, Gadchiroli, Maharashtra. The site covers 0.8 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Devapur Rith, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹8 lakh and a site of 0.8 acres.
When was it filed?
The application was filed on 15 Jul 2024.
Project details
| Official title | Diversion of 0.1825 Ha. (Which falls within tiger corridor) Forest Land for laying Underground Optical Cable from Devapur Rith to Navegaon along the Roads in existing RoW of SH-378 in Gadchiroli Tehsil of Dist-Gadchiroli of Maharashtra state under 4G saturation Project of GOI. |
|---|---|
| Status | More information requested |
| Status since | 15 Jul 2024 |
| Application filed | 15 Jul 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mahesh Nair |
| Land area | 3,100 m² |
| Project cost | ₹8 lakh |
| Village / locality | Devapur Rith |
| Taluk / tehsil | Gadchiroli |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16562 |
In context
69 applications in Gadchiroli since January 2022 are in the same category (Roads & highways): 3 approved, 47 filed or under review, and 19 withdrawn, lapsed or rejected. At 0.8 acres, this one is smaller than 86% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devapur Rith, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Establishing New Government Medical College in Dist. Gadchiroli in the state… — under wildlife review, 2 km away
- Establishing New Government Medical College in Dist. Gadchiroli in the state… — under forest review, 2 km away
- "The diversion of 4.9 ha forest land — under wildlife review, 2 km away
- "The diversion of 4.9 ha forest land — under forest review, 2 km away
- Residential Building, at Land of Survey No. 343/1, Mouza –Visapur Tah. & Dist.… — environmental approval granted, 3.1 km away
- Proposed pilot project for manufacturing of 1 KLD Portable Ethanol at Plot No.… — cleared for impact study, 4.6 km away
- The Diversion of Forest Land for Two Lanes With Paved Shoulder and Four Lane… — lapsed, 5.1 km away
- Application for Transfer of Environmental Clearance of Kaneri-1 Sand Ghat Area… — environmental approval granted, 6.7 km away
More from Mahesh Nair in Gadchiroli
- Diversion of 0.9871Ha Forest Land (out of which 0.82997Ha Forest land and… — more information requested
- Diversion of 1.8199Ha (out of which 1.5424Ha Forest Land and 0.2775 Non-Foerst… — more information requested
- Wildlife Clearance for 0.0769 Ha. Non Forest Land (which falls within tiger… — more information requested
- Diversion of 0.0156 Ha. (Out of which 0.0156 Ha Forest land and 0.0617 Ha… — more information requested
- Diversion of 0.1149 Ha. (Which Falls Within Tiger Corridor) Forest Land for… — more information requested
- Diversion of 1.1497 Ha. (Out of which 0.8704 Ha Forest land and 0.6055 Ha… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.