Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Dec 2025 |
| Application filed | 10 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | N G Projects LTD |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Kharade |
| Taluk / tehsil | Shahapur |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07398 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Feb 2025 (this page) | Lapsed | 11.1 acres | ₹2.3 crore |
| New project filed 10 Feb 2025 | Withdrawn | 11.1 acres | ₹2.3 crore |
In context
39 applications in Thane since January 2022 are in the same category (Mining): 11 approved, 8 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 11.1 acres, this one is larger than 85% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kharade, Shahapur, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Basalt Stone Mining Project (Area 4.5 ha) at Gut… — withdrawn, 0 m away
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study, 5 km away
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — under forest review, 5 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 5.9 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 5.9 km away
- Re-Diversion Forest Land for Laying of Optical Fiber Cable of Vodafone Idea… — lapsed, 8.9 km away
- Re-Diversion Forest Land for Laying of Optical Fiber Cable of Vodafone Idea… — lapsed, 8.9 km away
- Ghatghar Pumped Storage Scheme Stage II (125 MW) — lapsed, 11.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.