Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Jun 2025 |
| Application filed | 9 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Adani Green Energy Limited |
| Land area | 940.6 acres (380.7 ha) |
| Project cost | ₹7,047.6 crore |
| Village / locality | Bhorande |
| Taluk / tehsil | Murbad |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07919 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 9 Jun 2025 (this page) | Cleared for impact study | 940.6 acres | ₹7,047.6 crore |
| New project filed 29 May 2025 | Under forest review | 940.6 acres | ₹7,047.6 crore |
In context
15 applications in Thane since January 2022 are in the same category (Water & irrigation): 5 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 940.6 acres, this one is smaller than 53% of them.
Where it is
Bhorande, Murbad, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — under forest review, 0 m away
- Environmental Clearance for Basalt Stone Mining Project (Area 4.5 ha) at Gut… — lapsed, 5 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 4.5 ha) at Gut… — withdrawn, 5 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 6.5 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 6.5 km away
- Ghatghar Pumped Storage Scheme Stage II (125 MW) — lapsed, 10.2 km away
- Re-Diversion Forest Land for Laying of Optical Fiber Cable of Vodafone Idea… — lapsed, 11.8 km away
- Re-Diversion Forest Land for Laying of Optical Fiber Cable of Vodafone Idea… — lapsed, 11.8 km away
All 39 Adani Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.