Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Apr 2025 |
| Application filed | 1 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Saroj Colour Chem PVT LTD |
| Land area | 2,300 m² |
| Project cost | ₹7.4 crore |
| Village / locality | Pam Tembhi |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07537 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 1 Mar 2025 (this page) | Environmental approval granted | 0.6 acres | ₹7.4 crore |
| Early planning filed 21 Aug 2024 | Cleared for impact study | 0.6 acres | ₹7.4 crore |
In context
159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 0.6 acres, this one is smaller than 80% of them.
131 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pam Tembhi, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion project for the manufacturing of dyes & dyes intermediate products… — cleared for impact study, 0 m away
- Expansion project for the manufacturing of Dyes & Dyes Intermediate products… — environmental approval granted, 50 m away
- Expansion project for the manufacturing of Dyes & Dyes Intermediate products… — cleared for impact study, 50 m away
- Expansion in the Manufacturing Capacity of API Products from 28.50 TPM to… — environmental approval granted, 100 m away
- Expansion in the Manufacturing Capacity of API Products from 28.50 TPM to… — cleared for impact study, 100 m away
- Proposed new project for manufacturing of Ethylene/ Propylene Oxide… — environmental approval granted, 100 m away
- Proposed new project for manufacturing of Ethylene/ Propylene Oxide… — cleared for impact study, 100 m away
- Expansion in Capacity of Synthetic Organic Chemicals & Intermediates Chemicals… — environmental approval granted, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.