One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed new project for manufacturing of Ethylene/ Propylene Oxide Condensates by M/s…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Jul 2025 |
| Application filed | 27 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Dhoopchem India Pvt Ltd |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹10.4 crore |
| Village / locality | Pam Tembhi |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Mar 2026 | Environmental approval granted | 1 acre | ₹10.4 crore |
| Early planning filed 27 Jun 2025 (this page) | Cleared for impact study | 1 acre | ₹10.4 crore |
In context
159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 1 acre, this one is smaller than 55% of them.
131 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pam Tembhi, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed new project for manufacturing of Ethylene/ Propylene Oxide… — environmental approval granted, 0 m away
- Industrial project by M/s. Glenfin Chemicals Pvt. Ltd., (CIPM-1) — initial checks, 50 m away
- Expansion project for the manufacturing of dyes & dyes intermediate products… — environmental approval granted, 100 m away
- Expansion project for the manufacturing of dyes & dyes intermediate products… — cleared for impact study, 100 m away
- Expansion project for the manufacturing of Dyes & Dyes Intermediate products… — environmental approval granted, 150 m away
- Expansion project for the manufacturing of Dyes & Dyes Intermediate products… — cleared for impact study, 150 m away
- Expansion in the Manufacturing Capacity of API Products from 28.50 TPM to… — environmental approval granted, 200 m away
- Expansion in the Manufacturing Capacity of API Products from 28.50 TPM to… — cleared for impact study, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.