Cleared for impact studyIndustry · Ahmadnagar, Maharashtra

Environmental Clearance for Expansion of the existing Sugar factory from 12,000 TCD to 17,000 TCD, Expansion of Molasses-based Distillery unit from 150 KLPD to 400 KLPD (based on syrup, B-heavy, or C-molasses) by M/s. Shri Ambalika Sugar Private Limited

Environmental Clearance for Expansion of the existing Sugar factory from 12,000 TCD to 17,000 TCD, Expansion of Molasses-based Distillery unit from 150 KLPD to 400 KLPD (based on syrup, B-heavy, or C-molasses) by M/s. Shri Ambalika Sugar Private Limited is a proposed industrial project in Baradgaon Sudrik, Karjat, Ahmadnagar, Maharashtra. The site covers 170 acres. Its stated project cost is ₹1,056.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Aug 2025).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Expansion of the existing Sugar factory from 12,000 TCD to 17,000 TCD, Expansion of Molasses-based Distillery unit from 150 KLPD to 400 KLPD (based on syrup, B-heavy, or C-molasses) by M/s. Shri Ambalika Sugar Private Limited is a proposed industrial project in Baradgaon Sudrik, Karjat, Ahmadnagar, Maharashtra. The site covers 170 acres.

Who is building it?

The applicant is Shri Ambalika Sugar Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 20 Aug 2025), as of 27 Nov 2026.

Where is it?

In Baradgaon Sudrik, Karjat, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹1,056.1 crore and a site of 170 acres.

When was it filed?

The application was filed on 18 Aug 2025.

Project details

Official titleEnvironmental Clearance for Expansion of the existing Sugar factory from 12,000 TCD to 17,000 TCD, Expansion of Molasses-based Distillery unit from 150 KLPD to 400 KLPD (based on syrup, B-heavy, or C-molasses), along with expansion of the Cogeneration Plant from 38 MW to 62.5 MW at Gat No. 392, Baradgaon Sudrik Village, Ambikanagar, Taluka Karjat, District Ahilyanagar (Ahmednagar), State Maharashtra by M/s. Shri Ambalika Sugar Private Limited.
StatusCleared for impact study
Status since20 Aug 2025
Application filed18 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShri Ambalika Sugar Private Limited
Land area170 acres (68.8 ha)
Project cost₹1,056.1 crore
Village / localityBaradgaon Sudrik
Taluk / tehsilKarjat
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-07895

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 23 Jan 2026More information requested170 acres₹1,056.1 crore
Early planning filed 18 Aug 2025 (this page)Cleared for impact study170 acres₹1,056.1 crore

In context

62 applications in Ahmadnagar since January 2022 are in the same category (Industry): 36 approved, 14 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 170 acres, this one is larger than 73% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baradgaon Sudrik, Karjat, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.