Project details
| Official title | Environment Clearance for the Proposed Integrated Township Project at Village-Posari, Kumbharli, Karavale, Chirad, Shelarpada Tal. Ambernath, Dist. Thane by M/s Macrotech Developers Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 25 Aug 2025 |
| Application filed | 19 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Macrotech Developers Limited (Lodha) |
| Use | Township |
| Land area | 383 acres (155 ha) |
| Built-up area | 31,61,475 m² (3,40,29,801 sq ft) |
| Project cost | ₹4,083.6 crore |
| Village / locality | Amboshi |
| Taluk / tehsil | Ambarnath |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08086 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 383 acres, this one is larger than 99% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amboshi, Ambarnath, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for the Proposed Integrated Township Project by M/s… — cleared for impact study, 0 m away
- Kushiwali Stone Quarry (Sadruddin Bashar Khan) — lapsed, 2.6 km away
- Integrated Industrial Area Development Project on Plot bearing S. No. 58,… — environmental approval granted, 3 km away
- Proposed Affordable Housing Project for EWS, LIG and Convenience Shops Under… — environmental approval granted, 3.5 km away
- Proposed Affordable Housing Project for EWS, LIG and Convenience Shops Under… — cleared for impact study, 3.5 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — environmental approval granted, 3.7 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 3.7 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 3.7 km away
More from Macrotech Developers Limited (Lodha) in Thane
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — environmental approval granted
- Residential cum Commercial development at village Balkum, Dhokali and Kolshet… — environmental approval granted
- Amendment & Expansion in Ec for Proposed Construction Project of Residential… — environmental approval granted
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — environmental approval granted
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — cleared for impact study
- Residential cum Commercial development at village Balkum, Dhokali and Kolshet… — lapsed
29 Lodha (Macrotech Developers) projects in Thane
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.