Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Mar 2026 |
| Application filed | 1 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Macrotech Developers Limited (Lodha) |
| Use | Township |
| Land area | 376 acres (152.2 ha) |
| Built-up area | 20,01,641 m² (2,15,45,464 sq ft) |
| Plot area | 15,21,800 m² (1,63,80,503 sq ft) |
| Project cost | ₹30 crore |
| Village / locality | Desai |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09686 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Aug 2025 (this page) | Environmental approval granted | 376 acres | ₹30 crore |
| Early planning filed 8 Nov 2024 | Cleared for impact study | 376 acres | ₹30 crore |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 376 acres, this one is larger than 98% of them.
115 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Desai, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment & Expansion in Ec for Proposed Construction Project of Residential… — cleared for impact study, 0 m away
- Residential township at village Usarghar, Katai, Nilge & Ghesar Tal. Kalyan,… — initial checks, 0 m away
- Amendment & Expansion in Ec for Proposed Construction Project of Residential… — lapsed, 50 m away
- Amendment & Expansion in Ec for Proposed Construction Project of Residential… — lapsed, 50 m away
- Amendment & Expansion in Ec for Proposed Construction Project of Residential… — cleared for impact study, 50 m away
- Amendment & Expansion in Ec for Proposed Construction Project of Residential… — cleared for impact study, 50 m away
- Proposed development Pratik Greens-II project at Survey No. 81/1/3, 84/4/3,… — recommended by coastal authority, 350 m away
- Proposed development Pratik Greens-II project at Survey No. 81/1/3, 84/4/3,… — environmental approval granted, 350 m away
More from Macrotech Developers Limited (Lodha) in Thane
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — environmental approval granted
- Residential cum Commercial development at village Balkum, Dhokali and Kolshet… — environmental approval granted
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — environmental approval granted
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — cleared for impact study
- Environment Clearance for the Proposed Integrated Township Project by M/s… — cleared for impact study
- Residential cum Commercial development at village Balkum, Dhokali and Kolshet… — lapsed
29 Lodha (Macrotech Developers) projects in Thane
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.