One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential and Commercial Project 'Wanoway' at 55, Mohammadwadi by Abeda P.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Jun 2025 |
| Application filed | 28 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Abeda P Inamdar |
| Use | Mixed use |
| Land area | 12.4 acres (5 ha) |
| Built-up area | 3,65,000 m² (39,28,824 sq ft) |
| Project cost | ₹1,255 crore |
| Village / locality | Mahammadwadi |
| Taluk / tehsil | Pune City |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08372 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Aug 2025 | Environmental approval granted | 12.4 acres | ₹1,255 crore |
| Early planning filed 28 Jun 2025 (this page) | Cleared for impact study | 12.4 acres | ₹1,255 crore |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 79% of them.
320 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahammadwadi, Pune City, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Pune Ring Road Eastern Alignment (Part 2): 68.8 km Expressway Expansion in Pune, Maharashtra (13.7 km away).
Other projects nearby
- Proposed Residential and Commercial Project 'Wanoway' at 55, Mohammadwadi by… — environmental approval granted, 0 m away
- Proposed Residential and Commercial project "Ganga Elyseeum'' at S. No.… — initial checks, 250 m away
- Diversion of 0.528 Ha. Reserved Forest for Construction and Development of 18… — in-principle approval, conditions pending, 350 m away
- Proposed Expansion Project by Kanifnath Reality at Mohammadwadi — environmental approval granted, 600 m away
- Transfer of Environmental Clearance for RBD Shanti Renaissance from M/s RBD… — under environmental review, 650 m away
- Proposed expansion in Residential and Commercial Project at S. No.… — environmental approval granted, 650 m away
- RBD Shanti Renaissance by M/s RBD Infrastructures Pvt. Ltd. — environmental approval granted, 650 m away
- Expansion in Residential & commercial project- Raheja Vistas Phase VI at S.… — environmental approval granted, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.