Quick answers
What is this project?
Proposed Redevelopment of The Existing Structures Bearing Nos.921-1018 Known As "Oshiwara Riddhi Siddhi Chsl" On Plot Bearing CTS. No.1(Pt.), Village Oshiwara, Adarsh Nagar, New Link Road, Oshiwara, Jogeshwari (W) MHADA Scheme No. 34 Mumbai – 400 102. By M/s. Gurukrupa Realcon Infrabuild LLP is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1 acre.
Who is building it?
The applicant is Gurukrupa Realcon Infrabuild LLP.
Has it been approved?
No. The application was withdrawn on 18 Mar 2025, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹687 crore and a site of 1 acre.
When was it filed?
The application was filed on 27 Feb 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Redevelopment of The Existing Structures Bearing Nos.921-1018 Known As…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 18 Mar 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gurukrupa Realcon Infrabuild LLP |
| Use | Other |
| Land area | 4,000 m² |
| Project cost | ₹687 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08381 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Aug 2025 | Environmental approval granted | 1 acre | ₹687 crore |
| New project filed 27 Feb 2025 (this page) | Withdrawn | 1 acre | ₹687 crore |
| New project filed 27 Feb 2025 | Withdrawn | 1 acre | ₹687 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1 acre, this one is smaller than 74% of them.
530 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.1 km away).
Other projects nearby
- Proposed Redevelopment of The Existing Structures Bearing Nos.921-1018 Known… — environmental approval granted, 0 m away
- Proposed Redevelopment of The Existing Structures Bearing Nos.921-1018 Known… — withdrawn, 0 m away
- Proposed Redevelopment of Existing Building no. 7, 8 & 9 known as Oshiwara… — environmental approval granted, 100 m away
- The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS… — environmental approval granted, 100 m away
- The Proposed redevelopment of "Oshiwara Royal Sand CHS" On plot bearing CTS… — lapsed, 100 m away
- Oshiwara Royal Sand Project — withdrawn, 100 m away
- "Oshiwara Royal Sand CHS Ltd." — withdrawn, 100 m away
- Building project by Oshiwara Royal Sand CHS Ltd. — lapsed, 100 m away
All 4 Gurukrupa Realcon Infrabuild projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.