One of 2 filings for this project. The project's main page, with every filing and where each stands: 'Proposed Expansion of Industrial & Logistic Park Construction' by M/s. KVR Industrial…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Dec 2025 |
| Application filed | 24 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Kvr Industrial Park Private Limited |
| Use | Industrial |
| Land area | 51.2 acres (20.7 ha) |
| Built-up area | 1,88,573 m² (20,29,781 sq ft) |
| Project cost | ₹260 crore |
| Village / locality | Ranjangaon Ganpati |
| Taluk / tehsil | Shirur |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09180 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 23 Mar 2026 | Environmental approval granted | 51.2 acres | ₹260 crore |
| Early planning filed 24 Dec 2025 (this page) | Cleared for impact study | 51.2 acres | ₹260 crore |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 51.2 acres, this one is larger than 94% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranjangaon Ganpati, Shirur, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 'Proposed Expansion of Industrial & Logistic Park Construction' by M/s. KVR… — environmental approval granted, 0 m away
- Environmental Clearance for Expansion in Factory Building on Plot No. B-27,… — environmental approval granted, 950 m away
- Environment Clearance for Expansion of Industrial Shed Construction at Plot… — under environmental review, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — environmental approval granted, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — cleared for impact study, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — cleared for impact study, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — environmental approval granted, 1.2 km away
- Industrial Construction Project by Britannia Industries Ltd. — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.