Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Dec 2025 |
| Application filed | 14 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | lg ELECTRONICS INDIA LIMITED |
| Use | Industrial |
| Land area | 52.9 acres (21.4 ha) |
| Built-up area | 2,08,456 m² (22,43,800 sq ft) |
| Project cost | ₹1,672 crore |
| Village / locality | Dhok Sangavi |
| Taluk / tehsil | Shirur |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11026 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 2 Jan 2026 | Environmental approval granted | 52.9 acres | ₹1,672 crore |
| Early planning filed 14 Nov 2025 (this page) | Cleared for impact study | 52.9 acres | ₹1,672 crore |
| Early planning filed 10 Nov 2025 | Cleared for impact study | 52.9 acres | ₹16.7 crore |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 52.9 acres, this one is larger than 94% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhok Sangavi, Shirur, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Expansion of Industrial Shed Construction at Plot… — under environmental review, 0 m away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — environmental approval granted, 0 m away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — cleared for impact study, 0 m away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — environmental approval granted, 0 m away
- Proposed Project at Ranjangaon by M/s Whirlpool of India Ltd — environmental approval granted, 350 m away
- 'Proposed Expansion of Industrial & Logistic Park Construction' by M/s. KVR… — environmental approval granted, 1.2 km away
- 'Proposed Expansion of Industrial & Logistic Park Construction' by M/s. KVR… — cleared for impact study, 1.2 km away
- Proposed Project at Ranjangaon, Pune by M/s Bajel Projects Ltd — environmental approval granted, 1.2 km away
More from lg ELECTRONICS INDIA LIMITED in Pune
- Environment Clearance for Expansion of Industrial Shed Construction at Plot… — under environmental review
4 lg ELECTRONICS INDIA projects in Pune
All 5 lg ELECTRONICS INDIA projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.