Cleared for impact studyIndustry · Chandrapur, Maharashtra

2 x150 DRI Kilns for 99000 TPA of Sponge Iron Production and 11 MW Power Plant (6 MW WHRB and 5 MW AFBC) by Soilon Steel Private Limited

2 x150 DRI Kilns for 99000 TPA of Sponge Iron Production and 11 MW Power Plant (6 MW WHRB and 5 MW AFBC) by Soilon Steel Private Limited is a proposed industrial project in Marhegaon, Mul, Chandrapur, Maharashtra. The site covers 49.7 acres. Its stated project cost is ₹105 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Apr 2025).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

2 x150 DRI Kilns for 99000 TPA of Sponge Iron Production and 11 MW Power Plant (6 MW WHRB and 5 MW AFBC) by Soilon Steel Private Limited is a proposed industrial project in Marhegaon, Mul, Chandrapur, Maharashtra. The site covers 49.7 acres.

Who is building it?

The applicant is Soilon Steel Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Apr 2025), as of 27 Nov 2026.

Where is it?

In Marhegaon, Mul, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹105 crore and a site of 49.7 acres.

When was it filed?

The application was filed on 9 Apr 2025.

Project details

Official titleProposed Installation of 2 x150 DRI Kilns for 99000 TPA of Sponge Iron Production and 11 MW Power Plant (6 MW WHRB and 5 MW AFBC) by Soilon Steel Private Limited
StatusCleared for impact study
Status since17 Apr 2025
Application filed9 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSoilon Steel Private Limited
Land area49.7 acres (20.1 ha)
Project cost₹105 crore
Village / localityMarhegaon
Taluk / tehsilMul
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09272

In context

55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 49.7 acres, this one is smaller than 76% of them.

Where it is

Marhegaon, Mul, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.