What is this project?
Greenfield Project comprising of establishment of Pellet Plant (12,00,000 TPA), Coal Gasification Unit (Syn Gas 62,640 Nm3/Hr.), Sulphur Recovery Unit (2300 TPA), Gas based DRI Plant (Sponge Iron - 4,95,000 TPA), Electric Arc Furnace with 65 T - LRF & 65 T - VD (Billets - 4,22,950 TPA), Rolling Mill (TMT Rebars & Wire Rods – 4,00,000 TPA) and Brick Manufacturing unit (10,000 Bricks/day) is an approved industrial project in Telawasa, Bhadravati, Chandrapur, Maharashtra. The site covers 502.5 acres.
Who is building it?
The applicant is Greta Energy Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2026), as of 27 Nov 2026.
Where is it?
In Telawasa, Bhadravati, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹3,852 crore and a site of 502.5 acres.
When was it filed?
The application was filed on 11 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2026 |
| Application filed | 11 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Greta Energy Limited |
| Land area | 502.5 acres (203.4 ha) |
| Project cost | ₹3,852 crore |
| Village / locality | Telawasa |
| Taluk / tehsil | Bhadravati |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09978 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Aug 2025 (this page) | Environmental approval granted | 502.5 acres | ₹3,852 crore |
| Early planning filed 4 Oct 2024 | Cleared for impact study | 502.5 acres | ₹3,852 crore |
In context
55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 502.5 acres, this one is larger than 85% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Telawasa, Bhadravati, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — cleared for impact study, 0 m away
- Environmental Clearance Proposed Pohni Sand Ghat, Area 1.20 ha, Gut. no.… — environmental approval granted, 250 m away
- Environmental Clearance Proposed Pohni- Yvti Sand Ghat, Area 2.45 ha, Gut. no.… — environmental approval granted, 1.8 km away
- Revalidation of prior EC of Bamrda Sand Ghat, Area 4.80 ha, Gut. no. 54, 55,… — environmental approval granted, 2.6 km away
- EC Transfer of Bamrda Sand Ghat, Area 4.80 ha, Gut. no. 54, 55, 58, 59, 62,… — environmental approval granted, 2.6 km away
- Bamrda Sand Ghat, Area 4.80 ha, Gut. no. 54, 55, 58, 59, 62, 63, 64, 72,… — environmental approval granted, 2.6 km away
- Revalidation of prior EC of Dindoda- Soit Sand Ghat, Area 2.00 ha, Gut. no.… — environmental approval granted, 6 km away
- EC Transfer of Dindoda- Soit Sand Ghat, Area 2.00 ha, Gut. no. 139,140, 141,… — environmental approval granted, 6 km away
More from Greta Energy Limited in Chandrapur
- Environmental Clearance for Proposed Expansion of Steel Plant Comprising of… — under environmental review
All 3 Greta Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.