What is Developing? Open the mapMap

Environmental approval grantedIndustry · Chandrapur, Maharashtra

Greenfield Project comprising of establishment of Pellet Plant (12,00,000 TPA), Coal Gasification Unit (Syn Gas 62,640 Nm3/Hr.), Sulphur Recovery Unit (2300 TPA), Gas based DRI Plant (Sponge Iron - 4,95,000 TPA), Electric Arc Furnace with 65 T - LRF & 65 T - VD (Billets - 4,22,950 TPA), Rolling Mill (TMT Rebars & Wire Rods – 4,00,000 TPA) and Brick Manufacturing unit (10,000 Bricks/day)

Greenfield Project comprising of establishment of Pellet Plant (12,00,000 TPA), Coal Gasification Unit (Syn Gas 62,640 Nm3/Hr.), Sulphur Recovery Unit (2300 TPA), Gas based DRI Plant (Sponge Iron - 4,95,000 TPA), Electric Arc Furnace with 65 T - LRF & 65 T - VD (Billets - 4,22,950 TPA), Rolling Mill (TMT Rebars & Wire Rods – 4,00,000 TPA) and Brick Manufacturing unit (10,000 Bricks/day) is an approved industrial project in Telawasa, Bhadravati, Chandrapur, Maharashtra. The site covers 502.5 acres. Its stated project cost is ₹3,852 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 6 May 2026).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Project comprising of establishment of Pellet Plant (12,00,000 TPA), Coal Gasification Unit (Syn Gas 62,640 Nm3/Hr.), Sulphur Recovery Unit (2300 TPA), Gas based DRI Plant (Sponge Iron - 4,95,000 TPA), Electric Arc Furnace with 65 T - LRF & 65 T - VD (Billets - 4,22,950 TPA), Rolling Mill (TMT Rebars & Wire Rods – 4,00,000 TPA) and Brick Manufacturing unit (10,000 Bricks/day) is an approved industrial project in Telawasa, Bhadravati, Chandrapur, Maharashtra. The site covers 502.5 acres.

Who is building it?

The applicant is Greta Energy Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 6 May 2026), as of 27 Nov 2026.

Where is it?

In Telawasa, Bhadravati, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹3,852 crore and a site of 502.5 acres.

When was it filed?

The application was filed on 11 Aug 2025.

Project details

StatusEnvironmental approval granted
Status since6 May 2026
Application filed11 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantGreta Energy Limited
Land area502.5 acres (203.4 ha)
Project cost₹3,852 crore
Village / localityTelawasa
Taluk / tehsilBhadravati
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09978

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Aug 2025 (this page)Environmental approval granted502.5 acres₹3,852 crore
Early planning filed 4 Oct 2024Cleared for impact study502.5 acres₹3,852 crore

In context

55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 502.5 acres, this one is larger than 85% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Telawasa, Bhadravati, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Greta Energy Limited in Chandrapur

All 3 Greta Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.