Quick answers
What is this project?
Environmental Clearance for Proposed Expansion of Steel Plant Comprising of Establishment of 90,000 Nm3/Hr. Coal Gasification Unit Instead of Ec Permitted 62,640 Nm3/Hr., Establishment of 8,00,000 Tpa Gas Based Dri Plant Instead of Ec Permitted 4,95,000 Tpa, Establishment of 9,000 Tpa Sulphur Recover Unit Instead of Ec Permitted 2,300 Tpa, Establishment of 7,92,000 Tpa (1 X 80 T) Electric Arc Furnace Instead of Ec Permitted 4,22,950 Tpa (1 X 65 T), Establishment of 2,000 Tpd Air Separation Plant is a proposed industrial project in Telawasa, Bhadravati, Chandrapur, Maharashtra. The site covers 128 acres.
Who is building it?
The applicant is Greta Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Telawasa, Bhadravati, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹118.1 crore and a site of 128 acres.
When was it filed?
The application was filed on 1 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 1 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Greta Energy Limited |
| Land area | 128 acres (51.8 ha) |
| Project cost | ₹118.1 crore |
| Village / locality | Telawasa |
| Taluk / tehsil | Bhadravati |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13294 |
In context
55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 128 acres, this one is smaller than 55% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Telawasa, Bhadravati, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Revalidation of prior EC of Pipri de Sand Ghat, Area 4.50 ha, Gut. no. 45 to… — environmental approval granted, 2.8 km away
- EC Transfer of Pipri de Sand Ghat, Area 4.50 ha, Gut. no. 45 to 50, 52 to 57,… — environmental approval granted, 2.8 km away
- Pipri de Sand Ghat, Area 4.50 ha, Gut. no. 45 to 50, 52 to 57, Village Pipri… — environmental approval granted, 2.8 km away
- Coal to Chemicals including Coal-To-Syngas, Hydrogen, Methanol/DME and Urea — initial checks, 3.4 km away
- Coal to Chemicals including Coal-To-Syngas, Hydrogen, Methanol/DME and Urea — cleared for impact study, 3.4 km away
- Coal to Chemicals including Coal-To-Syngas, Hydrogen, Methanol/DME and Urea — environmental approval granted, 4 km away
- Niljai Expansion (Deep) Oc — environmental approval granted, 6.1 km away
- The Proposed Bhandak West Coal Mine, Villa ge Kesurli, Kuroda & Vijasan Tehsil… — cleared for impact study, 6.9 km away
More from Greta Energy Limited in Chandrapur
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — environmental approval granted
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — cleared for impact study
All 3 Greta Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.