Quick answers
What is Kumbhe Pumped Storage Project (1100 MW)?
Kumbhe Pumped Storage Project (1100 MW) is a proposed water and irrigation project in Kelgan, Mangaon, Raigarh, Maharashtra. The site covers 373.3 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kelgan, Mangaon, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹5,199.7 crore and a site of 373.3 acres.
When was it filed?
The application was filed on 21 Aug 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 21 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | NTPC Limited (NTPC) |
| Land area | 373.3 acres (151.1 ha) |
| Project cost | ₹5,199.7 crore |
| Village / locality | Kelgan |
| Taluk / tehsil | Mangaon |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10210 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 May 2026 | Lapsed | 373.3 acres | ₹5,199.7 crore |
| Early planning filed 21 Aug 2025 (this page) | Cleared for impact study | 373.3 acres | ₹5,199.7 crore |
In context
31 applications in Raigarh since January 2022 are in the same category (Water & irrigation): 11 approved, 14 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 373.3 acres, this one is smaller than 70% of them.
Where it is
Kelgan, Mangaon, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kumbhe Pumped Storage Project (1100 MW) — lapsed, 0 m away
- No Increase Pollution Load (NIPL) for Product Mix of Plant Capacity 25,50,000… — initial checks, 8.4 km away
- Industrial project by M/s. POSCO Maharashtra Steel Pvt. Ltd. (PMSPL). — initial checks, 8.4 km away
- Amalgamation of Existing Environmental Clearance of CGL, CRM and ACL… — environmental approval granted, 8.5 km away
- Setting up Steel Plant with processes of Pickling, Cold Rolling, Galvanizing &… — more information requested, 9 km away
- Expansion of Existing ERW & GI Steel Pipe with Pickling Activity 60,000TPA and… — lapsed, 9.1 km away
- Expansion of Existing ERW & GI Steel Pipe with Pickling Activity 60,000 TPA… — lapsed, 9.1 km away
- Proposed Project at Koste Bk, Raigad by M/s JTL Industries Ltd — under environmental review, 9.1 km away
16 NTPC projects in Raigarh
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.