All 129 projects, newest first
| Project | Type | Size | Status | Filed |
|---|---|---|---|---|
| Proposed Talcher-III to Pandiabili (ISTS) 400 kV D/c (Twin Moose) dedicated transmission… Basanta, Khordha, Odisha · filed by Ntpc | Power | 1,488.9 acres | Under forest review | 24 Nov 2026 |
| 57.105 MW Single Fuel (LNG) based Power Project at Hope Town (V), Ferrargunj (T), South… Hope Town, South Andaman, Andaman and Nicobar Islands · filed by Ntpc Vidyut Vyapar Nigam | Power | 2 acres | Under environmental review | 16 Nov 2026 |
| Amendment in Environment Clearance (EC) of Chatti Bariatu Coal Mining Project, NTPC… Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,596.9 acres | Under environmental review | 15 Nov 2026 |
| Amendment in Environment Clearance (EC) of Kerandari Coal Mining Project, NTPC Mining… Lochar, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 2,898.5 acres | Under environmental review | 15 Nov 2026 |
| Rammam Hydroelectric Power Project Stage-III (3X40 MW) Chebu Lamas Estate, Darjiling, West Bengal · filed by Ntpc | Power | 21.2 acres | More information requested | 4 Nov 2026 |
| North Dhadu (Eastern Part) Coal Mine Project with project area :546.59 HA, Production… Pindarkom, Latehar, Jharkhand · filed by Ntpc Mining | Mining | 1,350.7 acres | More information requested | 6 Oct 2026 |
| Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) &… Ghutkupali, Raigarh, Chhattisgarh · filed by Ntpc | Power | 3,135.2 acres | More information requested | 28 Sept 2026 |
| Tuma Bahra Power Project Bisrampur, Dhamtari, Chhattisgarh · filed by Ntpc | Power | 1,609.6 acres | Forest land use approved | 10 Sept 2026 |
| Diversion of Forest Land (Ex-Post Facto) for the Utilization of an Existing Makeup Water… Almatti, Vijayapura, Karnataka · filed by NTPC | Buildings & townships | 1,794 acres | Under forest review | 3 Sept 2026 |
| Expansion by Up to 20% of the Existing Capacity of the Talaipalli Coal Mining Project… Salhepali, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,237.1 acres | Under environmental review | 1 Sept 2026 |
| Feroze Gandhi Unchahar Thermal Power Station, Stage - II (2x210MW) Arkha Ahatmali, Rae Bareli, Uttar Pradesh · filed by Ntpc | Power | 2,203 acres | Environmental approval granted | 13 Aug 2026 |
| Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC… Chepa Kalan, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 8,202.5 acres | Environmental approval granted | 13 Jul 2026 |
| Khatiguda Power Project Khunti Padar, Nabarangapur, Odisha · filed by Ntpc | Power | 1,777.5 acres | Forest land use approved | 24 Jun 2026 |
| Expansion by addition of 500 MW (Stage-IV) Coal Based Thermal Power Plant at Feroz… Malkana, Rae Bareli, Uttar Pradesh · filed by Ntpc | Power | 2,203 acres | Environmental approval granted | 18 Jun 2026 |
| NTPC Auraiya Gas Power Station Jamuhan (Ct), Auraiya, Uttar Pradesh · filed by Ntpc | Power | 7 acres | Lapsed | 15 Jun 2026 |
| Banka Power Project Beldiha, Banka, Bihar · filed by Ntpc | Power | 0.5 acres | In-principle approval, conditions pending | 3 Jun 2026 |
| Kahalgaon Super Thermal Power Project Kusapur, Bhagalpur, Bihar · filed by Ntpc | Power | 3,360 acres | Under wildlife review | 25 May 2026 |
| Khatiguda Power Project Khunti Padar, Nabarangapur, Odisha · filed by Ntpc | Power | 1,777.5 acres | Lapsed | 24 May 2026 |
| Kumbhe Pumped Storage Project (1100 MW) Kelgan, Raigarh, Maharashtra · filed by Ntpc | Water & irrigation | 373.3 acres | Lapsed | 23 May 2026 |
| Rammam Hydro Power Project, Mikkhola, South District, West Bengal · filed by Ntpc | Power | 39.1 acres | More information requested | 18 May 2026 |
| North Dhadu Eastern Part Coal Mining Project Pindarkom, Latehar, Jharkhand · filed by Ntpc Mining | Mining | 1,311.4 acres | Under forest review | 11 May 2026 |
| Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III: 2x660 MW)… Remua, Anugul, Odisha · filed by Ntpc | Power | 551.5 acres | Under environmental review | 5 May 2026 |
| Rammam Hydro Power Project Bikmat, South District, Sikkim · filed by Ntpc | Power | 194.6 acres | Under forest review | 4 May 2026 |
| NTPC Limited Lara Super Thermal Power Station, Raigarh, Chhattisgarh Mahloi, Raigarh, Chhattisgarh · filed by Ntpc | Industry | 3,134 acres | Under forest review | 16 Apr 2026 |
| Deogarh Power Project Gadapal, Deogarh, Odisha · filed by Ntpc | Power | 1,640 acres | Forest land use approved | 12 Apr 2026 |
| Amba Pumped Storage Project, 1500 MW by NTPC Kurvande, Pune, Maharashtra · filed by Ntpc | Water & irrigation | 672.6 acres | Under environmental review | 10 Apr 2026 |
| Kahalgaon Super Thermal Power Project Balachini Kita, Godda, Jharkhand · filed by Ntpc | Mining | 118.7 acres | More information requested | 30 Mar 2026 |
| 1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III expansion at… Nirajanpur, Rae Bareli, Uttar Pradesh · filed by Ntpc | Power | 2,203 acres | Returned to applicant | 13 Mar 2026 |
| Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC… Arahara, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 8,202.5 acres | Environmental approval granted | 5 Feb 2026 |
| 1 X 250 MW Rourkela Power Project III of NTPC Sail Power Company Limited. Raurakela Town, Sundargarh, Odisha · filed by Ntpc Sail Power Company | Power | 150 acres | Lapsed | 22 Jan 2026 |
| Power project by M/S NTPC-SAIL Power Company Ltd. CPP-II (2 X 60MW) at DSP Complex, PO:… Dhunara, Paschim Bardhaman, West Bengal · filed by Ntpc Sail Power Company | Power | 57.5 acres | Lapsed | 9 Jan 2026 |
| Durgapur Captive Power Project-Ill (2x20 MW) by M/s. NTPC-SAIL Power Company Ltd. Punabad, Paschim Bardhaman, West Bengal · filed by Ntpc Sail Power Company | Power | 16.3 acres | Lapsed | 8 Jan 2026 |
| 2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher Thermal Power… Arjunanali, Anugul, Odisha · filed by Ntpc | Power | 104 acres | Environmental approval granted | 29 Dec 2025 |
| 2x195 MW (Stage-ll) Coal Based Thermal Power Plant by NTPC Senduari Gaj Singh, Muzaffarpur, Bihar · filed by Ntpc | Power | 1,237.7 acres | Lapsed | 22 Dec 2025 |
| Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied | Water & irrigation | ₹5,005.5 crore | Not approved | 22 Dec 2025 |
| Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied | Water & irrigation | ₹5,005.5 crore | Lapsed | 21 Dec 2025 |
| Forest Clearance Proposal for Truck Loading System (TLS) at KDCMP of NML. Gopda, Hazaribagh, Jharkhand · filed by Ntpc Mining | Other | 4.2 acres | Under forest review | 20 Dec 2025 |
| Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied | Other | ₹5,005.5 crore | More information requested | 15 Dec 2025 |
| 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages… Admunda, Raigarh, Chhattisgarh · filed by Ntpc | Power | 3,034.2 acres | Environmental approval granted | 19 Nov 2025 |
| Chatti Bariatu Coal Mining Project Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,596.9 acres | Under forest review | 11 Nov 2025 |
| North Dhadu (Eastern Part) Coal Mine Project with project area :546.59 HA, Production… Pindarkom, Latehar, Jharkhand · filed by Ntpc Mining | Mining | 1,350.7 acres | Cleared for impact study | 8 Nov 2025 |
| Talaipalli Coal Mining Projects Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,221.3 acres | Environmental approval granted | 31 Oct 2025 |
| North Dhadu (Eastern Part) Coal Mining Project Bishunpur, Latehar, Jharkhand · filed by Ntpc Mining | Mining | 1,669 acres | Returned to applicant | 19 Sept 2025 |
| Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant… Dulinga, Sundargarh, Odisha · filed by Ntpc | Power | 2,065 acres | Environmental approval granted | 11 Sept 2025 |
| Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) Kusumha, Aurangabad, Bihar · filed by Ntpc | Power | 2,970.9 acres | More information requested | 3 Sept 2025 |
| Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC… Langatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 8,202.5 acres | Environmental approval granted | 29 Aug 2025 |
| North Dhadu Eastern Part Coal Mining Project Marangloiya, Latehar, Jharkhand · filed by Ntpc Mining | Mining | 1,311.4 acres | Withdrawn | 25 Aug 2025 |
| Kumbhe Pumped Storage Project (1100 MW) Kelgan, Raigarh, Maharashtra · filed by Ntpc | Water & irrigation | 373.3 acres | Cleared for impact study | 21 Aug 2025 |
| Talaipalli Coal Mining Project Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,221.3 acres | Returned to applicant | 11 Aug 2025 |
| Transfer of Forest Clearance (331.198 Ha) of Pakribarwadih (North West) Opencast Coal… Bareatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,198.9 acres | More information requested | 5 Aug 2025 |
| Telangana Super Thermal Power Project, Phase-II (3x800MW) Isala Takkallapalli, Peddapalli, Telangana · filed by Ntpc | Power | 1,825 acres | Environmental approval granted | 22 Jul 2025 |
| Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) &… Ghutkupali, Raigarh, Chhattisgarh · filed by Ntpc | Power | 3,135.2 acres | Cleared for impact study | 18 Jul 2025 |
| Talaipalli Coal Mining Projects Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,221.3 acres | Withdrawn | 18 Jul 2025 |
| Rammam Hydroelectric Power Project Stage-III (3X40 MW) Chebu Lamas Estate, Darjiling, West Bengal · filed by Ntpc | Water & irrigation | 21.2 acres | Lapsed | 14 Jul 2025 |
| Talaipalli Coal Mining Projects Bichhinar, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,221.3 acres | Lapsed | 10 Jul 2025 |
| Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant… Dulinga, Sundargarh, Odisha · filed by Ntpc | Power | 2,065 acres | Cleared for impact study | 9 Jul 2025 |
| Feroze Gandhi Unchahar Thermal Power Project, Stage-I Arkha Ahatmali, Rae Bareli, Uttar Pradesh · filed by Ntpc | Power | 2,198 acres | Lapsed | 16 Jun 2025 |
| Darlipali Super Thermal Power Project, Stage-II (1x800 MW) Chichinda, Jharsuguda, Odisha · filed by Ntpc | Power | 2,065 acres | Returned to applicant | 30 May 2025 |
| Amendment of EC condition no. (xi) & (xiv) for transportation of coal by road for… Basaria, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 2,898.5 acres | Environmental approval granted | 29 May 2025 |
| Chatti Bariatu Coal Mining Project Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,596.9 acres | Environmental approval granted | 29 May 2025 |
| Kahalgaon Super Thermal Power Project Bara Khairbani, Godda, Jharkhand · filed by Ntpc | Railways & metro | ₹286 crore | Lapsed | 5 May 2025 |
| 66 Kv overhead Transmission Line for 25 MW AC Solar Plant Ghodasan Ghdasan, Junagadh, Gujarat · filed by Ntpc Renewable Energy | Power | 1.3 acres | Lapsed | 2 May 2025 |
| Gadarwara Super Thermal Power Project, Stage-II (2x800MW) Chiraha Kalan, Narsimhapur, Madhya Pradesh · filed by Ntpc | Power | 2,250.4 acres | Environmental approval granted | 17 Apr 2025 |
| Gadarwara Super Thermal Power Project, Stage-II (2x800MW) Gondijhiria, Narsimhapur, Madhya Pradesh · filed by Ntpc | Power | 2,250.4 acres | Returned to applicant | 11 Mar 2025 |
| Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) Kusumha, Aurangabad, Bihar · filed by Ntpc | Power | 2,970.9 acres | Environmental approval granted | 6 Feb 2025 |
| Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied | Water & irrigation | ₹5,005.5 crore | Cleared for impact study | 22 Jan 2025 |
| Kahalgaon Super Thermal Power Project, Bihar(4x210 MW) Stage-I Balia Kurmi Kita, Godda, Jharkhand · filed by Ntpc | Railways & metro | ₹286 crore | In-principle approval, conditions pending | 2 Jan 2025 |
| Transfer of Environment Clearance No. J-11015/435/2007-Ia.Ii(M) Dated 13.03.2008… Rautpara, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,213.3 acres | Environmental approval granted | 27 Dec 2024 |
| Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC… Langatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 8,202.5 acres | Environmental approval granted | 27 Nov 2024 |
| Diversion of 1.5 Ha Forest Land Earmarked for Safety Zone (In Addition to 150.49 Ha for… Rautpara, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 3.7 acres | Lapsed | 14 Nov 2024 |
| Korba Super Thermal Power Station Ghamata, Korba, Chhattisgarh · filed by Ntpc | Power | 248.6 acres | Under wildlife review | 11 Nov 2024 |
| Feroze Gandhi Unchahar Thermal Power Station, Stage-I Umran, Rae Bareli, Uttar Pradesh · filed by Ntpc | Power | 2,198 acres | Lapsed | 14 Oct 2024 |
| Diversion of 11.212 Ha Forest Land, Earmarked for Safety Zone (In Addition to 1026.438… Gugra, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 11,601.6 acres | Lapsed | 26 Sept 2024 |
| Floating Solar Project in Jayakwadi Reservoir Dam Water, Ahmadnagar, Maharashtra · filed by Ntpc Green Energy | Power | ₹8,067.5 crore | More information requested | 26 Sept 2024 |
| Floating Solar Project in Jayakwadi Reservoir Agar Kanadgaon, Aurangabad, Maharashtra · filed by Ntpc Green Energy | Power | 1,87,844.8 acres | Under wildlife review | 15 Sept 2024 |
| Kerandari Coal Mining Project Pagar, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 2,898.5 acres | Environmental approval granted | 5 Sept 2024 |
| Chatti Bariatu Coal Mining Project Jordag, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,596.9 acres | Environmental approval granted | 5 Sept 2024 |
| Badam Coal Mining Project Ammbajit, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 2,295 acres | In-principle approval, conditions pending | 3 Sept 2024 |
| Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC… Itij, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 8,202.5 acres | Environmental approval granted | 3 Sept 2024 |
| Transfer of Forest Clearance (304.75 Ha) of Dulanga Coal mining Project from NTPC… Kathafali, Sundargarh, Odisha · filed by Ntpc Mining | Mining | 1,884 acres | More information requested | 17 Jul 2024 |
| Talaipalli Coal Mining Projects Ralkera, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,221.3 acres | In-principle approval, conditions pending | 20 Jun 2024 |
| Kerandari Coal Mining Project Kodhamdiri, Chatra, Jharkhand · filed by Ntpc Mining | Mining | 2,898.5 acres | More information requested | 14 Jun 2024 |
| M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal Power Plant Akurahan Khargi, Muzaffarpur, Bihar · filed by Ntpc | Power | 1,237.7 acres | Environmental approval granted | 7 Jun 2024 |
| Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC… Sonbarsa, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 8,202.5 acres | Environmental approval granted | 24 May 2024 |
| Transfer of Forest Clearance (1026.438 Ha) of Pakri Barwadih Coal mining Project from… Chirudih, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 11,601.6 acres | More information requested | 21 May 2024 |
| M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal Power Plant… Akurahan Khargi, Muzaffarpur, Bihar · filed by Ntpc | Power | 1,237.7 acres | Withdrawn | 22 Apr 2024 |
| Dulanaga Opencast Coal Mining Project Forest, Sundargarh, Odisha · filed by Ntpc Mining | Mining | 1,940.7 acres | Environmental approval granted | 15 Apr 2024 |
| Transfer of Forest Clearance (128.92 Ha) of Chatti Bariatu Coal Mining Project from NTPC… Pagar, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,596.9 acres | In-principle approval, conditions pending | 9 Apr 2024 |
| Gadarwara Super Thermal Power Project, Stage-II (2x800MW) Kauria, Narsimhapur, Madhya Pradesh · filed by Ntpc | Power | 2,250.4 acres | Cleared for impact study | 9 Mar 2024 |
| Rammam Hydroelectric Power Project Stage-III (3X40 MW) Karmi, Darjiling, West Bengal · filed by Ntpc | Power | 13.3 acres | Lapsed | 5 Mar 2024 |
| Sipat Super Thermal Power Project Stage-III (1x800 MW) Reliya, Bilaspur, Chhattisgarh · filed by Ntpc | Power | 4,369.3 acres | Environmental approval granted | 19 Feb 2024 |
| Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) Akorha, Aurangabad, Bihar · filed by Ntpc | Power | 2,970.9 acres | Cleared for impact study | 16 Feb 2024 |
| NTPC Talaipalli Coal Mining Project Bichhinar, Raigarh, Chhattisgarh · filed by Ntpc | Mining | 5,237.1 acres | Returned to applicant | 14 Feb 2024 |
| Telangana Super Thermal Power Project, Phase-II (3x800MW) Isala Takkallapalli, Peddapalli, Telangana · filed by Ntpc | Power | 1,825 acres | Cleared for impact study | 14 Feb 2024 |
| Expansion of Pakri Barwadih Coal Mining Project (West & East Quarry) from 15 MTPA to 18… Arahara, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Environmental approval granted | 13 Feb 2024 |
| Kerandari Coal Mining Project Basaria, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 2,898.5 acres | Environmental approval granted | 6 Feb 2024 |
| Chatti Bariatu Coal Mining Project Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining | Mining | 1,596.9 acres | Environmental approval granted | 3 Feb 2024 |
| Expansion of Pakri Barwadih Coal Mining Project (West & East Quarry) from 15 MTPA to 18… Banka, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Returned to applicant | 31 Jan 2024 |
| Talaipalli Coal Mining Projects Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining | Mining | 5,221.3 acres | Environmental approval granted | 23 Jan 2024 |
| North West Quarry of Pakri Barwadih opencast Coal Mine Project Urule, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 1,198.9 acres | Environmental approval granted | 23 Jan 2024 |
| Amendment in EC w.r.t. Amalgamation of Environmental Clearances of Pakri Barwadih Coal… Darikalan, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 11,601.6 acres | Lapsed | 16 Dec 2023 |
| Amendment of Environment Clearance of Pakri Barwadih Coal Mining Project, NTPC Limited Deoria Khurd, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Environmental approval granted | 16 Dec 2023 |
| Kerandari Coal Mining Project Pagar, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 2,496 acres | Environmental approval granted | 14 Dec 2023 |
| Transfer of Environmental Clearances of Pakri Barwadih Coal Mining Project from M/s.… Barkagaon, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 11,601.6 acres | Environmental approval granted | 12 Dec 2023 |
| Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW) by NTPC Belapada, Anugul, Odisha · filed by Ntpc | Pipelines | 4,953.3 acres | Forest land use approved | 12 Dec 2023 |
| Forest Diversion Proposal for the Construction of Additional Reservoir and Unit-III of… Tileimal, Jharsuguda, Odisha · filed by Ntpc LTD Darlipali Super Thermal Power Project | Water & irrigation | 379.5 acres | Forest land use approved | 12 Dec 2023 |
| Expansion of Ramagundam STPP by addition of 2x800 MW (Stage-IV, Telangana STPP, Phase-I)… Ramagundam, Peddapalli, Telangana · filed by Ntpc | Power | 635 acres | Returned to applicant | 23 Nov 2023 |
| Chatti Bariatu Coal Mining Project Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 1,596.9 acres | Environmental approval granted | 7 Nov 2023 |
| Expansion of Pakri Barwadih Coal Mining Project of NTPC Limited for production capacity… Itij, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Lapsed | 7 Nov 2023 |
| Chatti Bariatu Coal Mining Project Jordag, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 1,596.9 acres | Lapsed | 30 Oct 2023 |
| Amendment of Environment Clearance of Pakri Barwadih Coal Mining Project, NTPC Limited Gugra, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Environmental approval granted | 20 Oct 2023 |
| 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages… Admunda, Raigarh, Chhattisgarh · filed by Ntpc | Power | 1,373.5 acres | Returned to applicant | 17 Oct 2023 |
| NTPC MGR from HURRA C Mines to Existing NTPC MGR for NTPC Kahalgaon, District Bhagalpur Balachini, Godda, Jharkhand · filed by Ntpc | Other | ₹2,030 crore | Lapsed | 10 Oct 2023 |
| Construction for Water Pumping Station, Tank, Pipeline & Underground 11 KV Transmission… 1 Chm, Bikaner, Rajasthan · filed by Ntpc Renewable Energy | Power | 653 acres | Forest land use approved | 9 Oct 2023 |
| Dulanga Coal Mining Project, Ntpc LTD. Forest, Sundargarh, Odisha · filed by Ntpc | Mining | 1,884 acres | Lapsed | 5 Oct 2023 |
| Darlipali Super Thermal Power Project, Stage-II (1x800 MW) Darlipali, Sundargarh, Odisha · filed by Ntpc | Power | 200.1 acres | Cleared for impact study | 15 Sept 2023 |
| North West Quarry of Pakri Barwadih opencast Coal Mine Project Bareatu, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 1,198.9 acres | Environmental approval granted | 11 Sept 2023 |
| Diversion of 0.709 Ha forest land for Augmentation of Banadag Railway Siding of NTPC… Katkamdag, Hazaribagh, Jharkhand · filed by Ntpc | Railways & metro | 60.8 acres | In-principle approval, conditions pending | 7 Aug 2023 |
| Kahalgaon Super Thermal Power Project Gopalpur, Bhagalpur, Bihar · filed by Ntpc | Power | 3,360 acres | More information requested | 27 Jul 2023 |
| EXPANSION OF DULANGA COAL MINING PROJECT (7.0 to 8.0 MTPA) Beladihi, Sundargarh, Odisha · filed by Ntpc | Mining | 3,509.5 acres | Lapsed | 25 Jul 2023 |
| Amendment of Environment Clearance of Pakri Barwadih Coal Mining Project, NTPC Limited Sinduari, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Environmental approval granted | 16 Jun 2023 |
| Pakri Barwadih Coal Mining Project of M/s NTPC Limited Pakri Barwadih, Hazaribagh, Jharkhand · filed by Ntpc | Mining | 8,202.5 acres | Withdrawn | 12 May 2023 |
| 2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages… Admunda, Raigarh, Chhattisgarh · filed by Ntpc | Power | 1,373.5 acres | Environmental approval granted | 7 May 2023 |
| Underground water pipeline for NTPC Khargone Super Thermal Power Plant (2X660) Dukhiya, East Nimar, Madhya Pradesh · filed by Ntpc | Pipelines | 13.8 acres | Forest land use approved | 3 May 2023 |
| "Construction of 400KV S/C TRANSMISSION LINE CPSU-I 400/33 KV PSS of M/s. NTPC to PGCIL… Modiya, Bikaner, Rajasthan · filed by Ntpc | Power | 1,716.7 acres | More information requested | 11 Apr 2023 |
| Disposal of Fly Ash in the abandoned Quarry situated of the Billi Markundi Village at… Markundi, Sonbhadra, Uttar Pradesh · filed by Ntpc | Buildings & townships | 89.7 acres | More information requested | 9 Feb 2023 |
| Darlipali Super Thermal Power Project, Stage-II (1x800 MW) Darlipali, Sundargarh, Odisha · filed by Ntpc | Power | 200.1 acres | Cleared for impact study | 7 Feb 2023 |
| NTPC Dulanga Coal Mining Project Khuntijharia, Sundargarh, Odisha · filed by Ntpc Limited Dulanga Coal Mining Project | Mining | 2,289.7 acres | Lapsed | 13 Dec 2022 |
| Forest Diversion Proposal for the Construction of Additional Reservoir and Unit-III of… Darlipali, Sundargarh, Odisha · filed by Ntpc LTD Darlipali Super Thermal Power Project | Water & irrigation | 132.7 acres | Lapsed | 28 Nov 2022 |
Companies filing for NTPC
NTPC files through 10 companies: Ntpc (75), Ntpc Mining (38), Ntpc Tamilnadu Energy Company Limtied (4), Ntpc Sail Power Company (3), Ntpc Renewable Energy (2), Ntpc Green Energy (2), Ntpc LTD Darlipali Super Thermal Power Project (2), Ntpc Vidyut Vyapar Nigam (1), NTPC (1), Ntpc Limited Dulanga Coal Mining Project (1).
NTPC projects by city
NTPC in Hazaribagh38
NTPC in Raigarh16
NTPC in Sundargarh11
NTPC in Latehar5
NTPC in Rae Bareli5
NTPC in Godda4
NTPC in The Nilgiris4
NTPC in Aurangabad4
NTPC in Darjiling3
NTPC in Anugul3
NTPC in Muzaffarpur3
NTPC in Peddapalli3
NTPC in Narsimhapur3
Where NTPC is building
- Hazaribagh, Jharkhand38
- Raigarh, Chhattisgarh14
- Sundargarh, Odisha11
- Latehar, Jharkhand5
- Rae Bareli, Uttar Pradesh5
- Godda, Jharkhand4
- The Nilgiris, Tamil Nadu4
- Darjiling, West Bengal3
- Anugul, Odisha3
- Muzaffarpur, Bihar3
- Aurangabad, Bihar3
- Peddapalli, Telangana3
- Narsimhapur, Madhya Pradesh3
- Nabarangapur, Odisha2
- Bhagalpur, Bihar2
- Raigarh, Maharashtra2
- Paschim Bardhaman, West Bengal2
- Jharsuguda, Odisha2
- Bikaner, Rajasthan2
- Khordha, Odisha1
- South Andaman, Andaman and Nicobar Islands1
- Dhamtari, Chhattisgarh1
- Vijayapura, Karnataka1
- Auraiya, Uttar Pradesh1
- Banka, Bihar1
- South District, West Bengal1
- South District, Sikkim1
- Deogarh, Odisha1
- Pune, Maharashtra1
- Junagadh, Gujarat1
Questions people ask
How many projects has NTPC filed?
129 since January 2022, of which 53 are approved and 46 are awaiting a decision.
Where are NTPC's projects?
Mostly in Hazaribagh, Jharkhand (38), Raigarh, Chhattisgarh (14), Sundargarh, Odisha (11), Latehar, Jharkhand (5) and Rae Bareli, Uttar Pradesh (5).
What did NTPC file most recently?
Proposed Talcher-III to Pandiabili (ISTS) 400 kV D/c (Twin Moose) dedicated transmission line by NTPC in Basanta, Khordha, filed on 24 Nov 2026. Status: Under forest review.
About this information
Compiled from publicly available approval records, grouped by the applicant's registered name. What is Developing? is not affiliated with NTPC; the logo is shown only to identify the company. Group companies that file under different names may appear on separate pages. Statuses can change between our updates; check with the authority before making decisions. Spotted a mistake? Tell us.