NTPC upcoming projects

NTPC Limited, through 10 companies, has filed 129 projects for environmental, forest, wildlife or coastal approval since January 2022: 53 approved and 46 awaiting a decision. They are in Hazaribagh, Raigarh and Sundargarh (15 states), covering 5,26,652.4 acres with a stated cost of ₹11,62,852.2 crore. The latest was filed on 24 Nov 2026.

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

129projects filed
46awaiting approval
37districts

All 129 projects, newest first

ProjectTypeSizeStatusFiled
Proposed Talcher-III to Pandiabili (ISTS) 400 kV D/c (Twin Moose) dedicated transmission…
Basanta, Khordha, Odisha · filed by Ntpc
Power1,488.9 acresUnder forest review24 Nov 2026
57.105 MW Single Fuel (LNG) based Power Project at Hope Town (V), Ferrargunj (T), South…
Hope Town, South Andaman, Andaman and Nicobar Islands · filed by Ntpc Vidyut Vyapar Nigam
Power2 acresUnder environmental review16 Nov 2026
Amendment in Environment Clearance (EC) of Chatti Bariatu Coal Mining Project, NTPC…
Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,596.9 acresUnder environmental review15 Nov 2026
Amendment in Environment Clearance (EC) of Kerandari Coal Mining Project, NTPC Mining…
Lochar, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining2,898.5 acresUnder environmental review15 Nov 2026
Rammam Hydroelectric Power Project Stage-III (3X40 MW)
Chebu Lamas Estate, Darjiling, West Bengal · filed by Ntpc
Power21.2 acresMore information requested4 Nov 2026
North Dhadu (Eastern Part) Coal Mine Project with project area :546.59 HA, Production…
Pindarkom, Latehar, Jharkhand · filed by Ntpc Mining
Mining1,350.7 acresMore information requested6 Oct 2026
Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) &…
Ghutkupali, Raigarh, Chhattisgarh · filed by Ntpc
Power3,135.2 acresMore information requested28 Sept 2026
Tuma Bahra Power Project
Bisrampur, Dhamtari, Chhattisgarh · filed by Ntpc
Power1,609.6 acresForest land use approved10 Sept 2026
Diversion of Forest Land (Ex-Post Facto) for the Utilization of an Existing Makeup Water…
Almatti, Vijayapura, Karnataka · filed by NTPC
Buildings & townships1,794 acresUnder forest review3 Sept 2026
Expansion by Up to 20% of the Existing Capacity of the Talaipalli Coal Mining Project…
Salhepali, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,237.1 acresUnder environmental review1 Sept 2026
Feroze Gandhi Unchahar Thermal Power Station, Stage - II (2x210MW)
Arkha Ahatmali, Rae Bareli, Uttar Pradesh · filed by Ntpc
Power2,203 acresEnvironmental approval granted13 Aug 2026
Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC…
Chepa Kalan, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining8,202.5 acresEnvironmental approval granted13 Jul 2026
Khatiguda Power Project
Khunti Padar, Nabarangapur, Odisha · filed by Ntpc
Power1,777.5 acresForest land use approved24 Jun 2026
Expansion by addition of 500 MW (Stage-IV) Coal Based Thermal Power Plant at Feroz…
Malkana, Rae Bareli, Uttar Pradesh · filed by Ntpc
Power2,203 acresEnvironmental approval granted18 Jun 2026
NTPC Auraiya Gas Power Station
Jamuhan (Ct), Auraiya, Uttar Pradesh · filed by Ntpc
Power7 acresLapsed15 Jun 2026
Banka Power Project
Beldiha, Banka, Bihar · filed by Ntpc
Power0.5 acresIn-principle approval, conditions pending3 Jun 2026
Kahalgaon Super Thermal Power Project
Kusapur, Bhagalpur, Bihar · filed by Ntpc
Power3,360 acresUnder wildlife review25 May 2026
Khatiguda Power Project
Khunti Padar, Nabarangapur, Odisha · filed by Ntpc
Power1,777.5 acresLapsed24 May 2026
Kumbhe Pumped Storage Project (1100 MW)
Kelgan, Raigarh, Maharashtra · filed by Ntpc
Water & irrigation373.3 acresLapsed23 May 2026
Rammam Hydro Power Project,
Mikkhola, South District, West Bengal · filed by Ntpc
Power39.1 acresMore information requested18 May 2026
North Dhadu Eastern Part Coal Mining Project
Pindarkom, Latehar, Jharkhand · filed by Ntpc Mining
Mining1,311.4 acresUnder forest review11 May 2026
Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III: 2x660 MW)…
Remua, Anugul, Odisha · filed by Ntpc
Power551.5 acresUnder environmental review5 May 2026
Rammam Hydro Power Project
Bikmat, South District, Sikkim · filed by Ntpc
Power194.6 acresUnder forest review4 May 2026
NTPC Limited Lara Super Thermal Power Station, Raigarh, Chhattisgarh
Mahloi, Raigarh, Chhattisgarh · filed by Ntpc
Industry3,134 acresUnder forest review16 Apr 2026
Deogarh Power Project
Gadapal, Deogarh, Odisha · filed by Ntpc
Power1,640 acresForest land use approved12 Apr 2026
Amba Pumped Storage Project, 1500 MW by NTPC
Kurvande, Pune, Maharashtra · filed by Ntpc
Water & irrigation672.6 acresUnder environmental review10 Apr 2026
Kahalgaon Super Thermal Power Project
Balachini Kita, Godda, Jharkhand · filed by Ntpc
Mining118.7 acresMore information requested30 Mar 2026
1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III expansion at…
Nirajanpur, Rae Bareli, Uttar Pradesh · filed by Ntpc
Power2,203 acresReturned to applicant13 Mar 2026
Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC…
Arahara, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining8,202.5 acresEnvironmental approval granted5 Feb 2026
1 X 250 MW Rourkela Power Project III of NTPC Sail Power Company Limited.
Raurakela Town, Sundargarh, Odisha · filed by Ntpc Sail Power Company
Power150 acresLapsed22 Jan 2026
Power project by M/S NTPC-SAIL Power Company Ltd. CPP-II (2 X 60MW) at DSP Complex, PO:…
Dhunara, Paschim Bardhaman, West Bengal · filed by Ntpc Sail Power Company
Power57.5 acresLapsed9 Jan 2026
Durgapur Captive Power Project-Ill (2x20 MW) by M/s. NTPC-SAIL Power Company Ltd.
Punabad, Paschim Bardhaman, West Bengal · filed by Ntpc Sail Power Company
Power16.3 acresLapsed8 Jan 2026
2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher Thermal Power…
Arjunanali, Anugul, Odisha · filed by Ntpc
Power104 acresEnvironmental approval granted29 Dec 2025
2x195 MW (Stage-ll) Coal Based Thermal Power Plant by NTPC
Senduari Gaj Singh, Muzaffarpur, Bihar · filed by Ntpc
Power1,237.7 acresLapsed22 Dec 2025
Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project
Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied
Water & irrigation₹5,005.5 croreNot approved22 Dec 2025
Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project
Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied
Water & irrigation₹5,005.5 croreLapsed21 Dec 2025
Forest Clearance Proposal for Truck Loading System (TLS) at KDCMP of NML.
Gopda, Hazaribagh, Jharkhand · filed by Ntpc Mining
Other4.2 acresUnder forest review20 Dec 2025
Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project
Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied
Other₹5,005.5 croreMore information requested15 Dec 2025
2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages…
Admunda, Raigarh, Chhattisgarh · filed by Ntpc
Power3,034.2 acresEnvironmental approval granted19 Nov 2025
Chatti Bariatu Coal Mining Project
Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,596.9 acresUnder forest review11 Nov 2025
North Dhadu (Eastern Part) Coal Mine Project with project area :546.59 HA, Production…
Pindarkom, Latehar, Jharkhand · filed by Ntpc Mining
Mining1,350.7 acresCleared for impact study8 Nov 2025
Talaipalli Coal Mining Projects
Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,221.3 acresEnvironmental approval granted31 Oct 2025
North Dhadu (Eastern Part) Coal Mining Project
Bishunpur, Latehar, Jharkhand · filed by Ntpc Mining
Mining1,669 acresReturned to applicant19 Sept 2025
Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant…
Dulinga, Sundargarh, Odisha · filed by Ntpc
Power2,065 acresEnvironmental approval granted11 Sept 2025
Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)
Kusumha, Aurangabad, Bihar · filed by Ntpc
Power2,970.9 acresMore information requested3 Sept 2025
Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC…
Langatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining8,202.5 acresEnvironmental approval granted29 Aug 2025
North Dhadu Eastern Part Coal Mining Project
Marangloiya, Latehar, Jharkhand · filed by Ntpc Mining
Mining1,311.4 acresWithdrawn25 Aug 2025
Kumbhe Pumped Storage Project (1100 MW)
Kelgan, Raigarh, Maharashtra · filed by Ntpc
Water & irrigation373.3 acresCleared for impact study21 Aug 2025
Talaipalli Coal Mining Project
Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,221.3 acresReturned to applicant11 Aug 2025
Transfer of Forest Clearance (331.198 Ha) of Pakribarwadih (North West) Opencast Coal…
Bareatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,198.9 acresMore information requested5 Aug 2025
Telangana Super Thermal Power Project, Phase-II (3x800MW)
Isala Takkallapalli, Peddapalli, Telangana · filed by Ntpc
Power1,825 acresEnvironmental approval granted22 Jul 2025
Expansion of Lara Super Thermal Power Project from 3200 MW [Stage-I (2x800 MW) &…
Ghutkupali, Raigarh, Chhattisgarh · filed by Ntpc
Power3,135.2 acresCleared for impact study18 Jul 2025
Talaipalli Coal Mining Projects
Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,221.3 acresWithdrawn18 Jul 2025
Rammam Hydroelectric Power Project Stage-III (3X40 MW)
Chebu Lamas Estate, Darjiling, West Bengal · filed by Ntpc
Water & irrigation21.2 acresLapsed14 Jul 2025
Talaipalli Coal Mining Projects
Bichhinar, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,221.3 acresLapsed10 Jul 2025
Expansion of 2x800 MW (Stage-I) Darlipali Supercritical Coal Based Thermal Power Plant…
Dulinga, Sundargarh, Odisha · filed by Ntpc
Power2,065 acresCleared for impact study9 Jul 2025
Feroze Gandhi Unchahar Thermal Power Project, Stage-I
Arkha Ahatmali, Rae Bareli, Uttar Pradesh · filed by Ntpc
Power2,198 acresLapsed16 Jun 2025
Darlipali Super Thermal Power Project, Stage-II (1x800 MW)
Chichinda, Jharsuguda, Odisha · filed by Ntpc
Power2,065 acresReturned to applicant30 May 2025
Amendment of EC condition no. (xi) & (xiv) for transportation of coal by road for…
Basaria, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining2,898.5 acresEnvironmental approval granted29 May 2025
Chatti Bariatu Coal Mining Project
Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,596.9 acresEnvironmental approval granted29 May 2025
Kahalgaon Super Thermal Power Project
Bara Khairbani, Godda, Jharkhand · filed by Ntpc
Railways & metro₹286 croreLapsed5 May 2025
66 Kv overhead Transmission Line for 25 MW AC Solar Plant Ghodasan
Ghdasan, Junagadh, Gujarat · filed by Ntpc Renewable Energy
Power1.3 acresLapsed2 May 2025
Gadarwara Super Thermal Power Project, Stage-II (2x800MW)
Chiraha Kalan, Narsimhapur, Madhya Pradesh · filed by Ntpc
Power2,250.4 acresEnvironmental approval granted17 Apr 2025
Gadarwara Super Thermal Power Project, Stage-II (2x800MW)
Gondijhiria, Narsimhapur, Madhya Pradesh · filed by Ntpc
Power2,250.4 acresReturned to applicant11 Mar 2025
Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)
Kusumha, Aurangabad, Bihar · filed by Ntpc
Power2,970.9 acresEnvironmental approval granted6 Feb 2025
Development of 1000 MW (4x250 MW) Upper Bhavani Pumped Storage Project
Mulligur, The Nilgiris, Tamil Nadu · filed by Ntpc Tamilnadu Energy Company Limtied
Water & irrigation₹5,005.5 croreCleared for impact study22 Jan 2025
Kahalgaon Super Thermal Power Project, Bihar(4x210 MW) Stage-I
Balia Kurmi Kita, Godda, Jharkhand · filed by Ntpc
Railways & metro₹286 croreIn-principle approval, conditions pending2 Jan 2025
Transfer of Environment Clearance No. J-11015/435/2007-Ia.Ii(M) Dated 13.03.2008…
Rautpara, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,213.3 acresEnvironmental approval granted27 Dec 2024
Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC…
Langatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining8,202.5 acresEnvironmental approval granted27 Nov 2024
Diversion of 1.5 Ha Forest Land Earmarked for Safety Zone (In Addition to 150.49 Ha for…
Rautpara, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining3.7 acresLapsed14 Nov 2024
Korba Super Thermal Power Station
Ghamata, Korba, Chhattisgarh · filed by Ntpc
Power248.6 acresUnder wildlife review11 Nov 2024
Feroze Gandhi Unchahar Thermal Power Station, Stage-I
Umran, Rae Bareli, Uttar Pradesh · filed by Ntpc
Power2,198 acresLapsed14 Oct 2024
Diversion of 11.212 Ha Forest Land, Earmarked for Safety Zone (In Addition to 1026.438…
Gugra, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining11,601.6 acresLapsed26 Sept 2024
Floating Solar Project in Jayakwadi Reservoir
Dam Water, Ahmadnagar, Maharashtra · filed by Ntpc Green Energy
Power₹8,067.5 croreMore information requested26 Sept 2024
Floating Solar Project in Jayakwadi Reservoir
Agar Kanadgaon, Aurangabad, Maharashtra · filed by Ntpc Green Energy
Power1,87,844.8 acresUnder wildlife review15 Sept 2024
Kerandari Coal Mining Project
Pagar, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining2,898.5 acresEnvironmental approval granted5 Sept 2024
Chatti Bariatu Coal Mining Project
Jordag, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,596.9 acresEnvironmental approval granted5 Sept 2024
Badam Coal Mining Project
Ammbajit, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining2,295 acresIn-principle approval, conditions pending3 Sept 2024
Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC…
Itij, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining8,202.5 acresEnvironmental approval granted3 Sept 2024
Transfer of Forest Clearance (304.75 Ha) of Dulanga Coal mining Project from NTPC…
Kathafali, Sundargarh, Odisha · filed by Ntpc Mining
Mining1,884 acresMore information requested17 Jul 2024
Talaipalli Coal Mining Projects
Ralkera, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,221.3 acresIn-principle approval, conditions pending20 Jun 2024
Kerandari Coal Mining Project
Kodhamdiri, Chatra, Jharkhand · filed by Ntpc Mining
Mining2,898.5 acresMore information requested14 Jun 2024
M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal Power Plant
Akurahan Khargi, Muzaffarpur, Bihar · filed by Ntpc
Power1,237.7 acresEnvironmental approval granted7 Jun 2024
Amendment in Environment Clearance (EC) of Pakri Barwadih Coal Mining Project, NTPC…
Sonbarsa, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining8,202.5 acresEnvironmental approval granted24 May 2024
Transfer of Forest Clearance (1026.438 Ha) of Pakri Barwadih Coal mining Project from…
Chirudih, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining11,601.6 acresMore information requested21 May 2024
M/s Muzaffarpur Thermal Power Station, 2X195 MW(Stage-II) Coal Based Thermal Power Plant…
Akurahan Khargi, Muzaffarpur, Bihar · filed by Ntpc
Power1,237.7 acresWithdrawn22 Apr 2024
Dulanaga Opencast Coal Mining Project
Forest, Sundargarh, Odisha · filed by Ntpc Mining
Mining1,940.7 acresEnvironmental approval granted15 Apr 2024
Transfer of Forest Clearance (128.92 Ha) of Chatti Bariatu Coal Mining Project from NTPC…
Pagar, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,596.9 acresIn-principle approval, conditions pending9 Apr 2024
Gadarwara Super Thermal Power Project, Stage-II (2x800MW)
Kauria, Narsimhapur, Madhya Pradesh · filed by Ntpc
Power2,250.4 acresCleared for impact study9 Mar 2024
Rammam Hydroelectric Power Project Stage-III (3X40 MW)
Karmi, Darjiling, West Bengal · filed by Ntpc
Power13.3 acresLapsed5 Mar 2024
Sipat Super Thermal Power Project Stage-III (1x800 MW)
Reliya, Bilaspur, Chhattisgarh · filed by Ntpc
Power4,369.3 acresEnvironmental approval granted19 Feb 2024
Nabinagar Super Thermal Power Project, Stage-II (3X800 MW)
Akorha, Aurangabad, Bihar · filed by Ntpc
Power2,970.9 acresCleared for impact study16 Feb 2024
NTPC Talaipalli Coal Mining Project
Bichhinar, Raigarh, Chhattisgarh · filed by Ntpc
Mining5,237.1 acresReturned to applicant14 Feb 2024
Telangana Super Thermal Power Project, Phase-II (3x800MW)
Isala Takkallapalli, Peddapalli, Telangana · filed by Ntpc
Power1,825 acresCleared for impact study14 Feb 2024
Expansion of Pakri Barwadih Coal Mining Project (West & East Quarry) from 15 MTPA to 18…
Arahara, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresEnvironmental approval granted13 Feb 2024
Kerandari Coal Mining Project
Basaria, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining2,898.5 acresEnvironmental approval granted6 Feb 2024
Chatti Bariatu Coal Mining Project
Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc Mining
Mining1,596.9 acresEnvironmental approval granted3 Feb 2024
Expansion of Pakri Barwadih Coal Mining Project (West & East Quarry) from 15 MTPA to 18…
Banka, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresReturned to applicant31 Jan 2024
Talaipalli Coal Mining Projects
Ajijgarh, Raigarh, Chhattisgarh · filed by Ntpc Mining
Mining5,221.3 acresEnvironmental approval granted23 Jan 2024
North West Quarry of Pakri Barwadih opencast Coal Mine Project
Urule, Hazaribagh, Jharkhand · filed by Ntpc
Mining1,198.9 acresEnvironmental approval granted23 Jan 2024
Amendment in EC w.r.t. Amalgamation of Environmental Clearances of Pakri Barwadih Coal…
Darikalan, Hazaribagh, Jharkhand · filed by Ntpc
Mining11,601.6 acresLapsed16 Dec 2023
Amendment of Environment Clearance of Pakri Barwadih Coal Mining Project, NTPC Limited
Deoria Khurd, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresEnvironmental approval granted16 Dec 2023
Kerandari Coal Mining Project
Pagar, Hazaribagh, Jharkhand · filed by Ntpc
Mining2,496 acresEnvironmental approval granted14 Dec 2023
Transfer of Environmental Clearances of Pakri Barwadih Coal Mining Project from M/s.…
Barkagaon, Hazaribagh, Jharkhand · filed by Ntpc
Mining11,601.6 acresEnvironmental approval granted12 Dec 2023
Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW) by NTPC
Belapada, Anugul, Odisha · filed by Ntpc
Pipelines4,953.3 acresForest land use approved12 Dec 2023
Forest Diversion Proposal for the Construction of Additional Reservoir and Unit-III of…
Tileimal, Jharsuguda, Odisha · filed by Ntpc LTD Darlipali Super Thermal Power Project
Water & irrigation379.5 acresForest land use approved12 Dec 2023
Expansion of Ramagundam STPP by addition of 2x800 MW (Stage-IV, Telangana STPP, Phase-I)…
Ramagundam, Peddapalli, Telangana · filed by Ntpc
Power635 acresReturned to applicant23 Nov 2023
Chatti Bariatu Coal Mining Project
Chatti Bariatu, Hazaribagh, Jharkhand · filed by Ntpc
Mining1,596.9 acresEnvironmental approval granted7 Nov 2023
Expansion of Pakri Barwadih Coal Mining Project of NTPC Limited for production capacity…
Itij, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresLapsed7 Nov 2023
Chatti Bariatu Coal Mining Project
Jordag, Hazaribagh, Jharkhand · filed by Ntpc
Mining1,596.9 acresLapsed30 Oct 2023
Amendment of Environment Clearance of Pakri Barwadih Coal Mining Project, NTPC Limited
Gugra, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresEnvironmental approval granted20 Oct 2023
2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages…
Admunda, Raigarh, Chhattisgarh · filed by Ntpc
Power1,373.5 acresReturned to applicant17 Oct 2023
NTPC MGR from HURRA C Mines to Existing NTPC MGR for NTPC Kahalgaon, District Bhagalpur
Balachini, Godda, Jharkhand · filed by Ntpc
Other₹2,030 croreLapsed10 Oct 2023
Construction for Water Pumping Station, Tank, Pipeline & Underground 11 KV Transmission…
1 Chm, Bikaner, Rajasthan · filed by Ntpc Renewable Energy
Power653 acresForest land use approved9 Oct 2023
Dulanga Coal Mining Project, Ntpc LTD.
Forest, Sundargarh, Odisha · filed by Ntpc
Mining1,884 acresLapsed5 Oct 2023
Darlipali Super Thermal Power Project, Stage-II (1x800 MW)
Darlipali, Sundargarh, Odisha · filed by Ntpc
Power200.1 acresCleared for impact study15 Sept 2023
North West Quarry of Pakri Barwadih opencast Coal Mine Project
Bareatu, Hazaribagh, Jharkhand · filed by Ntpc
Mining1,198.9 acresEnvironmental approval granted11 Sept 2023
Diversion of 0.709 Ha forest land for Augmentation of Banadag Railway Siding of NTPC…
Katkamdag, Hazaribagh, Jharkhand · filed by Ntpc
Railways & metro60.8 acresIn-principle approval, conditions pending7 Aug 2023
Kahalgaon Super Thermal Power Project
Gopalpur, Bhagalpur, Bihar · filed by Ntpc
Power3,360 acresMore information requested27 Jul 2023
EXPANSION OF DULANGA COAL MINING PROJECT (7.0 to 8.0 MTPA)
Beladihi, Sundargarh, Odisha · filed by Ntpc
Mining3,509.5 acresLapsed25 Jul 2023
Amendment of Environment Clearance of Pakri Barwadih Coal Mining Project, NTPC Limited
Sinduari, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresEnvironmental approval granted16 Jun 2023
Pakri Barwadih Coal Mining Project of M/s NTPC Limited
Pakri Barwadih, Hazaribagh, Jharkhand · filed by Ntpc
Mining8,202.5 acresWithdrawn12 May 2023
2x800 MW (Expansion, Stage-II) Coal Based Lara Super Thermal Power Project at villages…
Admunda, Raigarh, Chhattisgarh · filed by Ntpc
Power1,373.5 acresEnvironmental approval granted7 May 2023
Underground water pipeline for NTPC Khargone Super Thermal Power Plant (2X660)
Dukhiya, East Nimar, Madhya Pradesh · filed by Ntpc
Pipelines13.8 acresForest land use approved3 May 2023
"Construction of 400KV S/C TRANSMISSION LINE CPSU-I 400/33 KV PSS of M/s. NTPC to PGCIL…
Modiya, Bikaner, Rajasthan · filed by Ntpc
Power1,716.7 acresMore information requested11 Apr 2023
Disposal of Fly Ash in the abandoned Quarry situated of the Billi Markundi Village at…
Markundi, Sonbhadra, Uttar Pradesh · filed by Ntpc
Buildings & townships89.7 acresMore information requested9 Feb 2023
Darlipali Super Thermal Power Project, Stage-II (1x800 MW)
Darlipali, Sundargarh, Odisha · filed by Ntpc
Power200.1 acresCleared for impact study7 Feb 2023
NTPC Dulanga Coal Mining Project
Khuntijharia, Sundargarh, Odisha · filed by Ntpc Limited Dulanga Coal Mining Project
Mining2,289.7 acresLapsed13 Dec 2022
Forest Diversion Proposal for the Construction of Additional Reservoir and Unit-III of…
Darlipali, Sundargarh, Odisha · filed by Ntpc LTD Darlipali Super Thermal Power Project
Water & irrigation132.7 acresLapsed28 Nov 2022

Companies filing for NTPC

NTPC files through 10 companies: Ntpc (75), Ntpc Mining (38), Ntpc Tamilnadu Energy Company Limtied (4), Ntpc Sail Power Company (3), Ntpc Renewable Energy (2), Ntpc Green Energy (2), Ntpc LTD Darlipali Super Thermal Power Project (2), Ntpc Vidyut Vyapar Nigam (1), NTPC (1), Ntpc Limited Dulanga Coal Mining Project (1).

NTPC projects by city

Where NTPC is building

Questions people ask

How many projects has NTPC filed?

129 since January 2022, of which 53 are approved and 46 are awaiting a decision.

Where are NTPC's projects?

Mostly in Hazaribagh, Jharkhand (38), Raigarh, Chhattisgarh (14), Sundargarh, Odisha (11), Latehar, Jharkhand (5) and Rae Bareli, Uttar Pradesh (5).

What did NTPC file most recently?

Proposed Talcher-III to Pandiabili (ISTS) 400 kV D/c (Twin Moose) dedicated transmission line by NTPC in Basanta, Khordha, filed on 24 Nov 2026. Status: Under forest review.

About this information

Compiled from publicly available approval records, grouped by the applicant's registered name. What is Developing? is not affiliated with NTPC; the logo is shown only to identify the company. Group companies that file under different names may appear on separate pages. Statuses can change between our updates; check with the authority before making decisions. Spotted a mistake? Tell us.