Quick answers
What is this project?
Proposed Commercial Development of PPL Reservation on plot bearing C.T.S. No. 140 & 141 of village Kurla - 4, (L- Ward) under Accommodation reservation at LBS Road, Kurla (west), Mumbai- 400 070 is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.7 acres.
Who is building it?
The applicant is Horizon Projects Private Limited.
Has it been approved?
No. The application was withdrawn on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹450 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 17 Mar 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Commercial Development of PPL Reservation on plot bearing C.T.S. No. 140 & 141…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 17 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Horizon Projects Private Limited |
| Land area | 2,700 m² |
| Project cost | ₹450 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10622 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Mar 2025 (this page) | Withdrawn | 0.7 acres | ₹450 crore |
| New project filed 19 Dec 2024 | Environmental approval granted | 0.7 acres | ₹450 crore |
| New project filed 10 Dec 2024 | Withdrawn | 0.7 acres | ₹450 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.7 acres, this one is smaller than 85% of them.
348 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (11.4 km away).
Other projects nearby
- Proposed Commercial Development of PPL Reservation on plot bearing C.T.S. No.… — environmental approval granted, 0 m away
- Proposed Commercial Development of PPL Reservation on plot bearing C.T.S. No.… — withdrawn, 0 m away
- Proposed Addition Alteration/ Vertical Extension in the Existing School… — environmental approval granted, 400 m away
- Proposed Redevelopment Under regulation no. 33(19) of DCPR 2034 on property… — cleared for impact study, 450 m away
- Proposed Redevelopment of Existing School Building at Plot no. SF-5 in 'G'… — under environmental review, 550 m away
- Proposed Expansion of Commercial office Building on plot Bearing no. C-59 'G'… — initial checks, 700 m away
- "Proposed Redevelopment project on plot bearing C.T.S. No. 7247, 7247/1 to 4… — environmental approval granted, 750 m away
- Proposed Redevelopment of Under Scheme 33(7)(A) Dcr of Building Known As… — environmental approval granted, 750 m away
4 Horizon Projects projects in Mumbai
All 9 Horizon Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.