What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Mumbai Suburban, Maharashtra

Proposed Joint Redevelopment Of Existing Bldg.No.H-2,Infinity Tower Co-operative Housing Society Ltd.(formerly known as Oshiwara Vishal CHSL and Oshiwara Girnar CHSL).Survey no.41(A), CTS No.1(pt), & 11,12(pt), 13 (pt),27(pt),34(pt), 28, 29, 32, 38, 55(pt), 96(pt), Village Oshiwara, Jogeshwari (West) Mumbai-400102 by M/s.Rassaz Infrastructure Pvt.Ltd.

Proposed Joint Redevelopment Of Existing Bldg.No.H-2,Infinity Tower Co-operative Housing Society Ltd.(formerly known as Oshiwara Vishal CHSL and Oshiwara Girnar CHSL).Survey no.41(A), CTS No.1(pt), & 11,12(pt), 13 (pt),27(pt),34(pt), 28, 29, 32, 38, 55(pt), 96(pt), Village Oshiwara, Jogeshwari (West) Mumbai-400102 by M/s.Rassaz Infrastructure Pvt.Ltd is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans buildings of up to 39 floors on 0.6 acres. Its stated project cost is ₹350 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Feb 2026).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Joint Redevelopment Of Existing Bldg.No.H-2,Infinity Tower Co-operative Housing Society Ltd.(formerly known as Oshiwara Vishal CHSL and Oshiwara Girnar CHSL).Survey no.41(A), CTS No.1(pt), & 11,12(pt), 13 (pt),27(pt),34(pt), 28, 29, 32, 38, 55(pt), 96(pt), Village Oshiwara, Jogeshwari (West) Mumbai-400102 by M/s.Rassaz Infrastructure Pvt.Ltd is an approved residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans buildings of up to 39 floors on 0.6 acres.

Who is building it?

The applicant is Rassaz Infrastructure PVT LTD.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Feb 2026), as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹350 crore and a site of 0.6 acres.

When was it filed?

The application was filed on 13 Nov 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Joint Redevelopment Of Existing Bldg.No.H-2,Infinity Tower Co-operative Housing…

Project details

StatusEnvironmental approval granted
Status since13 Feb 2026
Application filed13 Nov 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRassaz Infrastructure PVT LTD
UseResidential
Floors (tallest)39
Land area2,500 m²
Built-up area38,564 m² (4,15,099 sq ft)
Project cost₹350 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-10682

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 2 Apr 2026Environmental approval granted0.6 acres₹350 crore
New project filed 13 Nov 2025 (this page)Environmental approval granted0.6 acres₹350 crore

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.6 acres, this one is smaller than 87% of them.

544 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12 km away).

Other projects nearby

All 4 Rassaz Infrastructure projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.