Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Apr 2026 |
| Application filed | 4 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Thdc India Limited |
| Land area | 1,671.9 acres (676.6 ha) |
| Project cost | ₹6,815 crore |
| Village / locality | Khubi |
| Taluk / tehsil | Junnar |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10992 |
In context
45 applications in Pune since January 2022 are in the same category (Water & irrigation): 21 approved, 15 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,671.9 acres, this one is larger than 62% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khubi, Junnar, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malshej Ghat Closed Loop Off-Stream Pumped Storage Project (1200 MW) — more information requested, 500 m away
- The Rehabilitation and Up-Gradation of Existing Kalyan-Nirmal National Highway… — more information requested, 3 km away
- Kalu Pumped Storage Project (1800 MW) — under environmental review, 3.8 km away
- LAYING OUT UNDERGROUND 80MM GI WATER PIPELINE FOR AGRICULTURE AND DRINKING… — in-principle approval, conditions pending, 16.2 km away
- LAYING OUT UNDERGROUND 80MM GI WATER PIPELINE FOR AGRICULTURE AND DRINKING… — in-principle approval, conditions pending, 17 km away
- Mining project by M/S. Shivsai Stone Crusher Tarfe Shri. Atul P. Kanade &… — withdrawn, 18.7 km away
- Mining project by M/S. Shivsai Stone Crusher Tarfe Shri. Atul P. Kanade &… — not approved, 18.7 km away
- Malshej Ghat Bhorande Pumped Storage Project (1440 MW) — cleared for impact study, 21.3 km away
More from Thdc India Limited in Pune
- Malshej Ghat Closed Loop Off-Stream Pumped Storage Project (1200 MW) — more information requested
All 17 Thdc India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.