Wanoja Limestone Block (Area: 313 Ha) with Cement Grade Limestone Production Capacity: 0.30 Million TPA, Top Soil: 0.01 Million TPA, Waste (Overburden): 0.16 Million TPA (Total Excavation: 0.47 Million TPA) located at Villages: Wanoja, Zutting and Naranda, Tehsil: Korpana, District: Chandrapur, State: Maharashtra is a proposed mining project in Naranda, Korpana, Chandrapur, Maharashtra. The site covers 773.4 acres.
Who is building it?
The applicant is Dalmia Cement (Bharat) Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Jun 2026), as of 27 Nov 2026.
Where is it?
In Naranda, Korpana, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹36 crore and a site of 773.4 acres.
When was it filed?
The application was filed on 15 Apr 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Jun 2026 |
| Application filed | 15 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dalmia Cement (Bharat) Limited |
| Land area | 773.4 acres (313 ha) |
| Project cost | ₹36 crore |
| Village / locality | Naranda |
| Taluk / tehsil | Korpana |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11615 |
In context
341 applications in Chandrapur since January 2022 are in the same category (Mining): 280 approved, 28 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 773.4 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Naranda, Korpana, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wanoja Limestone Block (area 313 Ha.) in Villages- Wanoja, Zutting and… — returned to applicant, 0 m away
- Naranda Limestone Mines ML area 71.01 ha and Production of 2.4 MTPA — environmental approval granted, 1.5 km away
- Ec Amendment of Naranda Limestone Mine (Ml Area 71.01 Ha and Production of 2.4… — lapsed, 1.5 km away
- Zutting(18.06 Ha), Zutting(25.28 Ha), Zutting(42.16 Ha) Limestone Mines — under environmental review, 1.7 km away
- Diversion of 17.00 Ha. Forest land for Mining lease of Naranda Limestone Block… — more information requested, 1.8 km away
- Diversion of 2.640 Ha. Rf Land for Construction of 220KV Transmission Line… — in-principle approval, conditions pending, 3.7 km away
- Preliminary Exploration for locating Limestone deposits in Naranda-Bori… — initial checks, 3.8 km away
- Preliminary Exploration for locating Limestone deposits in Naranda-Bori… — lapsed, 3.8 km away
More from Dalmia Cement (Bharat) Limited in Chandrapur
- Sangoda Limestone Mining Project (Mine Lease Area of 154.7 ha) — under environmental review
- Zutting(18.06 Ha), Zutting(25.28 Ha), Zutting(42.16 Ha) Limestone Mines — under environmental review
- Wanoja Limestone Block (area 313 Ha.) in Villages- Wanoja, Zutting and… — returned to applicant
- Naranda Limestone Mines ML area 71.01 ha and Production of 2.4 MTPA — environmental approval granted
- Proposed expansion of the capacity of Sangoda Limestone Mine from 0.3 MTPA to… — cleared for impact study
6 Dalmia Cement (Bharat) projects in Chandrapur
All 56 Dalmia Cement (Bharat) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.