Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 27 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Yamazaki Mazak Machine Tools Private Limited |
| Use | Industrial |
| Land area | 21.8 acres (8.8 ha) |
| Built-up area | 61,585 m² (6,62,895 sq ft) |
| Project cost | ₹484.6 crore |
| Village / locality | Karegaon |
| Taluk / tehsil | Shirur |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11676 |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 21.8 acres, this one is larger than 87% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karegaon, Shirur, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project at Ranjangaon by M/s Whirlpool of India Ltd — environmental approval granted, 900 m away
- Environment Clearance for Expansion of Industrial Shed Construction at Plot… — under environmental review, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — environmental approval granted, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — cleared for impact study, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — cleared for impact study, 1.2 km away
- Proposed Expansion of Industrial Shed Construction at Plot No. A-5, MIDC… — environmental approval granted, 1.2 km away
- Proposed Industrial Shed By "M/S Pacific Alloys Private Limited" at E-85, MIDC… — environmental approval granted, 1.5 km away
- Proposed Industrial Shed of "M/s. Tata Autocomp GY Batteries Pvt. Ltd." at… — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.