Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Sept 2026 |
| Application filed | 25 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Jailaxmi Casting and Alloys Private Limited |
| Land area | 16.7 acres (6.8 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Farola |
| Taluk / tehsil | Paithan |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12228 |
In context
50 applications in Aurangabad since January 2022 are in the same category (Industry): 34 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.7 acres, this one is smaller than 52% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Farola, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED GREENFIELD PROJECT FOR MANUFACTURING OF ALLOYS STEEL BILLETS AND… — lapsed, 150 m away
- Industrial project by M/s. Jailaxmi Alloy Steels Pvt. Ltd; — lapsed, 150 m away
- Proposed Industrial Shed Project at Plot No.31, Auric Bidkin Industrial Area,… — environmental approval granted, 4.5 km away
- Factory Building on Plot No. 60, Sector No. 14, AURIC Bidkin, T.Q. Paithan,… — environmental approval granted, 5.4 km away
- Proposed Expansion in Commercial Electric Vehicle Manufacturing plant… — environmental approval granted, 5.5 km away
- Proposed commercial electric vehicle manufacturing plant at Sector No 14, Plot… — environmental approval granted, 5.5 km away
- Proposed commercial electric vehicle manufacturing plant at Sector No 14, Plot… — lapsed, 5.5 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.20 ha) at Gut… — not approved, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.