Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Jul 2026 |
| Application filed | 19 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Indo Autotech Limited |
| Use | Industrial |
| Land area | 30.1 acres (12.2 ha) |
| Built-up area | 27,740 m² (2,98,591 sq ft) |
| Project cost | ₹172.3 crore |
| Village / locality | Bidkin |
| Taluk / tehsil | Paithan |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14019 |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30.1 acres, this one is larger than 66% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bidkin, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Factory Building on Plot No. 60, Sector No. 14, AURIC Bidkin, T.Q. Paithan,… — environmental approval granted, 950 m away
- Proposed Expansion in Commercial Electric Vehicle Manufacturing plant… — environmental approval granted, 950 m away
- Proposed commercial electric vehicle manufacturing plant at Sector No 14, Plot… — environmental approval granted, 950 m away
- Proposed commercial electric vehicle manufacturing plant at Sector No 14, Plot… — lapsed, 950 m away
- Transfer of EC vide letter no.SIA/MH/INFRA2/517793/2025 dt. 14.07.2025,… — environmental approval granted, 1.6 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — environmental approval granted, 1.6 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — environmental approval granted, 1.6 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — cleared for impact study, 1.6 km away
All 5 Indo Autotech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.