Returned to applicantIndustry · Satara, Maharashtra

Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises located at Gat. No. 147/A, Village- Sukhed, Taluka- Khandala, District- Satara, Maharashtra by M/s Ashirwad Industries.

Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises located at Gat. No. 147/A, Village- Sukhed, Taluka- Khandala, District- Satara, Maharashtra by M/s Ashirwad Industries is a proposed industrial project in Sukhed, Khandala, Satara, Maharashtra. The site covers 2.5 acres. Its stated project cost is ₹9.7 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 8 Jul 2026).

See it on the live map All projects in Satara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the existing premises located at Gat. No. 147/A, Village- Sukhed, Taluka- Khandala, District- Satara, Maharashtra by M/s Ashirwad Industries is a proposed industrial project in Sukhed, Khandala, Satara, Maharashtra. The site covers 2.5 acres.

Who is building it?

The applicant is Ashirwad Industries.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Sukhed, Khandala, Satara, Maharashtra.

How big is it?

It has a stated cost of ₹9.7 crore and a site of 2.5 acres.

When was it filed?

The application was filed on 2 Jun 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within the…

Project details

StatusReturned to applicant
Status since8 Jul 2026
Application filed2 Jun 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantAshirwad Industries
Land area2.5 acres (1 ha)
Project cost₹9.7 crore
Village / localitySukhed
Taluk / tehsilKhandala
DistrictSatara
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-12897

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 8 Oct 2026Lapsed2.5 acres₹9.7 crore
Expansion filed 2 Jun 2026 (this page)Returned to applicant2.5 acres₹9.7 crore
Early planning filed 24 Mar 2025Cleared for impact study2.5 acres₹9.7 crore

In context

36 applications in Satara since January 2022 are in the same category (Industry): 23 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sukhed, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ashirwad Industries in Satara

All 4 Ashirwad Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.