Quick answers
What is this project?
Diversion of Forest Land for Construction of Approach Road, Electricity Line and Laying Underground Drinking Water Pipeline for Dongari Khandoba Temple is a proposed building project in Waghoshi, Khandala, Satara, Maharashtra. The site covers 0.9 acres.
Who is building it?
The applicant is Zilla Parishad Satara.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Waghoshi, Khandala, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.9 acres and 3,620 m² of forest land.
When was it filed?
The application was filed on 13 Feb 2026.
Project details
| Official title | Proposal for Diversion of Forest Land for Construction of Approach Road, Electricity Line and Laying Underground Drinking Water Pipeline for Dongari Khandoba Temple at Village-Ahire, Waghoshi and Sukhed Tal-Khandala Dist-Satara |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 13 Nov 2026 |
| Application filed | 13 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Zilla Parishad Satara |
| Land area | 3,600 m² |
| Forest land | 3,620 m² |
| Project cost | ₹10 lakh |
| Village / locality | Waghoshi |
| Taluk / tehsil | Khandala |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15188 |
In context
52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.9 acres, this one is smaller than 90% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Waghoshi, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within… — lapsed, 2 km away
- Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within… — returned to applicant, 2 km away
- Proposed Ethyl Acetate manufacturing with production capacity of 40TPD within… — cleared for impact study, 2 km away
- Proposed expansion of ethanol production from 60KLPD to 130KLPD from rectified… — lapsed, 2 km away
- Diversion of Forest Land for Laying of Underground Gravity Distribution… — in-principle approval, conditions pending, 3.4 km away
- Shri. Chandrakant Gajanan Pokale, Shri. Karan Sanjeev Kusalkar, Shri.… — not approved, 3.5 km away
- Environmental Clearance for the Stone quarry of Mrs. Yogini Sunil Shinde &… — environmental approval granted, 3.9 km away
- Proposed "Industrial Shed" Located at Gat No. 211 / 1, 212, 214, 215, 216 (P),… — more information requested, 4.9 km away
More from Zilla Parishad Satara in Satara
- The Diversion of Forest Land for the Submergence Area of the Dhawali (Jungati)… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.