Quick answers
What is this project?
Proposed 240 MW (1 x 120 + 2 x 60 MW) Tilari Pumped Storage Project (PSP) is a proposed water and irrigation project in Kodali, Chandgad, Kolhapur, Maharashtra. The site covers 240.4 acres.
Who is building it?
The applicant is Shree Tatyasaheb Kore Warana Sahakari Navshkti Nirman Sanstha Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kodali, Chandgad, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹1,386.7 crore and a site of 240.4 acres.
When was it filed?
The application was filed on 20 Jul 2026.
Project details
| Official title | Proposed 240 MW (1 x 120 + 2 x 60 MW) Tilari Pumped Storage Project (PSP) Located at Kodali Village, Chandgad Taluka, District Kolhapur |
|---|---|
| Status | Under environmental review |
| Status since | 7 Nov 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Shree Tatyasaheb Kore Warana Sahakari Navshkti Nirman Sanstha Limited |
| Land area | 240.4 acres (97.3 ha) |
| Project cost | ₹1,386.7 crore |
| Village / locality | Kodali |
| Taluk / tehsil | Chandgad |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13022 |
In context
10 applications in Kolhapur since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kodali, Chandgad, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of Forest Land for Laying of Underground Ofc Single Duct and… — forest land use approved, 4.7 km away
- Diversion of forest land for Construction of Subsidiary Storage Dam Across… — under forest review, 7.4 km away
- Diversion of forest land for Construction of Subsidiary Storage Dam Across… — more information requested, 7.4 km away
- Improvement Of MDR-162 to make Road Widening of Jambare Gavthan To… — lapsed, 12.8 km away
- Re Appraisal of Environmental Clearance Granted by Deiaa for the Basalt Stone… — lapsed, 14.9 km away
- Environmental Clearance for Basalt Stone Quarry of Shri. Ashish Vijay Dani… — environmental approval granted, 16.8 km away
- Distillery Plant of 200 Klpd Capacity With 3 MW Captive Power Plant Using… — cleared for impact study, 18.1 km away
- Expansion of Sugar Factory from 4,900 TCD to 10,000 TCD, Distillery from 40… — environmental approval granted, 18.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.