Quick answers
What is this project?
Re-Diversion of Forest Land for Laying of Underground Ofc Single Duct and Cable Within Row of Existing Road, Road Passing Through Forest Land is an approved telecom project in Parle, Chandgad, Kolhapur, Maharashtra. The site covers 2.6 acres.
Who is building it?
The applicant is Sanjay Pundlikrao Dharmale.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 3 Aug 2026), as of 27 Nov 2026.
Where is it?
In Parle, Chandgad, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹9.7 crore; a site of 2.6 acres and 2.6 acres (1 ha) of forest land.
When was it filed?
The application was filed on 15 Jun 2024.
Project details
| Official title | Proposal for Re-Diversion of Forest Land for Laying of Underground Ofc Single Duct and Cable Within Row of Existing Road, Road Passing Through Forest Land at Village Madhyal Tal. Kagai, Village Sawarde Khalasa , Parle, Kodali, Tal. Chandgad, Dist. Kolhapur, & Village Ghativade, Bambarde, Hewale, Medhe , Kasai, Vajre , Up to Dist. Boundary of Sindhudurg, Tal. Dodamarg, Dist Sindhudurg. |
|---|---|
| Status | Forest land use approved |
| Status since | 3 Aug 2026 |
| Application filed | 15 Jun 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Sanjay Pundlikrao Dharmale |
| Land area | 2.6 acres (1 ha) |
| Forest land | 2.6 acres (1 ha) |
| Project cost | ₹9.7 crore |
| Village / locality | Parle |
| Taluk / tehsil | Chandgad |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14788 |
In context
18 applications in Kolhapur since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 13 withdrawn, lapsed or rejected. At 2.6 acres, this one is larger than 55% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parle, Chandgad, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 240 MW (1 x 120 + 2 x 60 MW) Tilari Pumped Storage Project (PSP) — under environmental review, 4.7 km away
- Diversion of forest land for Construction of Subsidiary Storage Dam Across… — under forest review, 8 km away
- Diversion of forest land for Construction of Subsidiary Storage Dam Across… — more information requested, 8 km away
- Improvement Of MDR-162 to make Road Widening of Jambare Gavthan To… — lapsed, 8.8 km away
- Re Appraisal of Environmental Clearance Granted by Deiaa for the Basalt Stone… — lapsed, 11.2 km away
- Environmental Clearance for Basalt Stone Quarry of Shri. Ashish Vijay Dani… — environmental approval granted, 14.7 km away
- Distillery Plant of 200 Klpd Capacity With 3 MW Captive Power Plant Using… — cleared for impact study, 16.1 km away
- Expansion of Sugar Factory from 4,900 TCD to 10,000 TCD, Distillery from 40… — environmental approval granted, 16.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.