Project details
| Status | Withdrawn |
|---|---|
| Status since | 27 May 2026 |
| Application filed | 27 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Lodha Developers Limited |
| Land area | 1,748.1 acres (707.4 ha) |
| Project cost | ₹14,661 crore |
| Village / locality | Bale |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13034 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,748.1 acres, this one is larger than 100% of them.
38 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bale, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment of EC for Integrated Township Project at Villages Asode, Burdul,… — under environmental review, 600 m away
- Integrated Township Project at Village Asode, Burdul, Narhen, Usatane, Pali,… — under environmental review, 600 m away
- Proposed Data Centre project at Plot Sr. No. 2/1, 9/1B, 21, 22/A, 22/B, 22/C,… — environmental approval granted, 1.5 km away
- Proposed Data Centre project at Plot Sr. No. 2/1, 9/1B, 21, 22/A, 22/B, 22/C,… — cleared for impact study, 1.5 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — environmental approval granted, 1.6 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 1.6 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 1.6 km away
- Expansion in Data Centre project at Plot Sr. No. 2/1, 9/1A, 9/1B, 9/2/1, 10/1,… — environmental approval granted, 1.6 km away
More from Lodha Developers Limited in Thane
- Residential township at village Usarghar, Katai, Nilge & Ghesar Tal. Kalyan,… — initial checks
- Amendment of EC for Integrated Township Project at Villages Asode, Burdul,… — under environmental review
- Environment clearance [along with Consent to Establish as per MoEF & CC OM… — under environmental review
- Integrated Township Project at Village Asode, Burdul, Narhen, Usatane, Pali,… — under environmental review
- Amendment in Environmental Clearance of Integrated Township Project at… — under environmental review
- Residential cum Commercial development at village Balkum, Dhokali and Kolshet… — environmental approval granted
29 Lodha (Macrotech Developers) projects in Thane
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.