Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Jul 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Lodha Developers Limited |
| Use | Township |
| Land area | 1,042.5 acres (421.9 ha) |
| Built-up area | 32,28,765 m² (3,47,54,104 sq ft) |
| Project cost | ₹14,661 crore |
| Village / locality | Bamali |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13180 |
What the filings say
What is planned
Lodha Developers Limited (formerly Macrotech Developers Limited) proposes the development of an Integrated Township Project across multiple villages in the Ambernath and Thane talukas. The project is classified as a Township and Area Development project under Schedule 8(b) of the Environment Impact Assessment (EIA) Notification, 2006.
The project has undergone several regulatory stages, including an initial Environmental Clearance (EC) granted in December 2021, an expansion clearance in September 2023, and a formal transfer of the EC to Lodha Developers Limited in February 2026. The township is designed as a large-scale residential and mixed-use development divided into multiple sectors, including Sectors J1, J2, I2, I3, G, H, B1, B2, B3, C1, C2, E2, E3, and L.
Layout and design
The township layout is spread across a non-contiguous area intersected by major regional infrastructure. The applicant's project reports indicate that the Diva-Panvel Railway line passes through the project site at village Narivali. Additionally, the Mumbai-Delhi Dedicated Freight Corridor and the proposed Kanjurmarg-Mahape-Kalyan phata Metro Line are planned to pass through the township area.
To maintain connectivity between the parts divided by these corridors, the applicant is required to construct necessary bridges or roads at their own cost, subject to approval from the concerned departments. The master plan must also account for a Gas Authority of India Limited (GAIL) gas pipeline and high-tension electricity lines passing through certain land parcels, with specific safety distances maintained from these utilities.
Land and surroundings
The project site encompasses land in the villages of Asode, Burdul, Narhen, Usatane, Pali, and Chirad in Ambernath Taluka, and Bale, Bamali, Narivali, Wakalan, Nagaon, and Nighu in Thane Taluka. According to government notifications, the land is situated within various planning zones, including Green Zones, Urbanisable Zones, and Limited Development Zones.
The project area includes lands with varying topography. The applicant is required to submit a contour map, and no construction is permitted on land with a slope equal to or greater than 1:5. Public roads and existing rights of way within the township area must be kept intact and open to the general public.
Water, power and access
The township will be accessed via an existing 18-metre wide road leading from the Taloja Industrial Estate to the pipeline road. Internal access roads to private and government lands surrounded by the project must be at least 9 metres wide.
The applicant is responsible for providing the entire water supply and electricity infrastructure at their own cost. The project must include:
- A dedicated system for rainwater harvesting in each building.
- A wastewater recycling system for the reuse of treated water.
- The installation and operation of solar energy systems.
Environmental safeguards
The applicant has established a methodology for baseline data collection covering a 10-kilometre radius around the site. This includes primary monitoring of ambient air quality, ground and surface water, noise levels, flora, fauna, and traffic studies within a 2-kilometre radius.
Solid waste and wastewater must be disposed of according to criteria set by the Maharashtra Pollution Control Board (MPCB). Existing natural drainage features, such as nallas and water bodies, cannot be closed, and specific buffer distances must be maintained from lakes and rivers. The applicant must also obtain a No Objection Certificate from the Archaeological Department for specific land parcels in villages Narhen and Wakalan.
Lodha Integrated Township Project at Village Asode, Burdul, Narhen, Usatane, Pali, Chirad, Taluka: Ambernath, Village Bale, Bamali, Narivali, Wakalan, Nagaon, Nighu, Taluka: Thane, District: Thane, State: Maharashtra, India site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,042.5 acres, this one is larger than 99% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamali, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment of EC for Integrated Township Project at Villages Asode, Burdul,… — under environmental review, 0 m away
- Integrated Township Project at Village Asode, Burdul, Narhen, Usatane, Pali,… — withdrawn, 600 m away
- Proposed Data Centre project at Plot Sr. No. 2/1, 9/1B, 21, 22/A, 22/B, 22/C,… — environmental approval granted, 2.2 km away
- Proposed Data Centre project at Plot Sr. No. 2/1, 9/1B, 21, 22/A, 22/B, 22/C,… — cleared for impact study, 2.2 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — environmental approval granted, 2.2 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 2.2 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 2.2 km away
- Expansion in Data Centre project at Plot Sr. No. 2/1, 9/1A, 9/1B, 9/2/1, 10/1,… — environmental approval granted, 2.2 km away
More from Lodha Developers Limited in Thane
- Residential township at village Usarghar, Katai, Nilge & Ghesar Tal. Kalyan,… — initial checks
- Amendment of EC for Integrated Township Project at Villages Asode, Burdul,… — under environmental review
- Environment clearance [along with Consent to Establish as per MoEF & CC OM… — under environmental review
- Amendment in Environmental Clearance of Integrated Township Project at… — under environmental review
- Integrated Township Project at Village Asode, Burdul, Narhen, Usatane, Pali,… — withdrawn
- Residential cum Commercial development at village Balkum, Dhokali and Kolshet… — environmental approval granted
29 Lodha (Macrotech Developers) projects in Thane
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.