Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Jan 2026 |
| Application filed | 6 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kwalichem Private Limited |
| Land area | 1,600 m² |
| Project cost | ₹15.9 crore |
| Village / locality | Rabada |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13246 |
In context
100 applications in Thane since January 2022 are in the same category (Industry): 67 approved, 16 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 37 days from filing to approval. At 0.4 acres, this one is smaller than 76% of them.
197 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rabada, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Improvement of road towards Ashwini Quarry near Yadav Nagar in Airoli… — lapsed, 600 m away
- Proposed Expansion in Data centre project by M/s. GARGANTUAN INDUSTRIAL SPACE… — lapsed, 650 m away
- Proposed Expansion in Data centre project by M/s. GARGANTUAN INDUSTRIAL SPACE… — environmental approval granted, 650 m away
- Expansion of Proposed "Data Center" AT R-847/2 & Plot No: R-979, T.T.C.… — environmental approval granted, 650 m away
- Expansion of Proposed "Data Center" AT R-847/2 & Plot No: R-979, T.T.C.… — withdrawn, 650 m away
- Expansion of Proposed "Data Center" AT R-847/2 & Plot No: R-979, T.T.C.… — environmental approval granted, 650 m away
- Expansion in for "Data Center" at Plot No. R-847/2 & R-979, R-847/3,… — environmental approval granted, 700 m away
- Expansion for "Data Center" at Plot No. R-847/2 & R-979, R-847/3, R-847/3/1,… — environmental approval granted, 700 m away